9.9 MW Wind Power Project by KPL International Ltd. in Gujarat
#14of 770 in Renewable energy#10of 387 in India#23of 629 in Verra (VCS)#3of 417 in AMS-I.D
Audit Analysis
A 9.9 MW wind power project in Gujarat, India, verified under VCS AMS-I.D. with a VVB-confirmed investment additionality test and a standard grid-emission-factor baseline. The project shows conservative delivery (actual reductions ~15.6% below estimates in one sub-period) and no reversal risk inherent to renewable generation, though several minor metering and reporting deficiencies were flagged by the verifier. Overall a low-risk renewable energy credit with moderate documentation completeness.
Red Flags
- Meter calibration gap at Jamanvada site (22-Aug to 06-Oct 2021) required a conservative 0.4% error factor, indicating a monitoring data-quality weakness
- Missing declaration from the project proponent regarding participation in other GHG trading programs, which is a corrective action still open per the verification report
- Leakage justification is inconsistent across documents: the 2022 verification report states it was not addressed, while the 2024 monitoring report labels it 'deemed negligible' without a quantified analysis
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 23,374 | 21,374 | 2,000 | |
| 2018 | 24,752 | 24,752 | 0 | |
| 2019 | 25,764 | 25,764 | 0 | |
| 2020 | 21,285 | 21,285 | 0 | |
| 2021 | 22,719 | 14,076 | 8,643 | |
| 2022 | 22,074 | 0 | 22,074 | |
| 2023 | 23,270 | 0 | 23,270 | |
| 2024 | 5,943 | 0 | 5,943 | |
| Total | 169,181 | 107,251 | 61,930 |
Risk Indicators
VVB-confirmed investment test
No reversal risk (renewable generation)
0% deduction, justification inconsistent across docs
Project-specific grid EF, no reassessment date stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →