Access to safe drinking water project in Senegal
GS-4072 ↗ · current registry ID: GS12090
#18of 202 in Industrial#73of 426 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe drinking water project in Senegal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline, absence of a stated buffer pool, and numerous inter-document contradictions (particularly on leakage treatment, crediting period, and total ERR figures). The project delivered approximately 72.5% of the pro-rata annual expectation, indicating conservative crediting, yet four material findings and two corrective actions in the initial monitoring report raise questions about MRV rigour.
Red Flags
- No buffer pool percentage stated in any available document, leaving permanence risk unquantified for a 5-year crediting period
- Nine inter-document contradictions identified, including a 6.9× discrepancy in total ERR (118,127 vs 814,690) and conflicting leakage treatments (5% quantified vs 0% deemed negligible)
- Crediting period in the PDD (2022–2037, 15 years) conflicts with the verification report (2023–2028, 5 years), suggesting possible project restructuring not fully documented
- Four material findings in the initial monitoring report, including incorrect fNRB calculation and misaligned SDG7 indicator, required corrective action
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
No buffer pool stated; no reversals reported
5% quantified deduction applied
Project-specific baseline; no reassessment data
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →