Albay Çiğiltepe WPP Capacity Addition Project

ICR-223 ↗

4.1 / 10
Integrity
5.1
Transparency
3.4
Claim Safety
4.0
Documentation
3.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses the ACM0002 methodology with a project baseline.

missing No buffer pool percentage is stated, reversal events are marked as not addressed, and the verification comments request stronger discussion of operational and regulatory risks.

Transparency

missing The monitoring period is not stated, and both claimed and verified emission reduction totals are missing from the extracted record.

inferred The VVB is named, but the low extraction confidence and missing registry details limit confidence in the public record.

Claim Safety

verified Leakage is described as quantified, with a leakage deduction of 0%, which is better than an unaddressed leakage claim.

missing The verification comments say ICR is not endorsed under ICAO CORSIA and ask for evidence of CORSIA compliance, while CCP status is not stated.

Documentation

missing The extraction confidence is low, and one of the available documents was poorly readable.

missing The record relies heavily on a PDD, while the comments request a PDF upload, proof of ownership, and several missing methodological references.

Detailed Analysis

Integrity

The project benefits from additionality being confirmed by the VVB and from a stated project baseline under ACM0002. However, permanence is weakly documented because no buffer pool percentage is provided and reversal events are not addressed, while the verification comments also ask for a stronger discussion of project risks and materiality. Overall integrity is therefore moderate rather than strong.

Transparency

Transparency is limited because the monitoring period is not stated and the extracted record does not include claimed or verified emission reduction totals. The VVB is identified, but the low extraction confidence and missing registry completeness items reduce confidence in the MRV trail. The absence of clear public-facing figures makes it hard to independently assess performance.

Claim Safety

Claim safety is mixed. Leakage is at least treated explicitly, with a quantified approach and a 0% deduction, but the record does not show usage monitoring details or verified usage rates. The verification comments also state that ICR was not endorsed under ICAO CORSIA and request evidence of compliance, which increases over-claiming risk.

Documentation

Documentation quality is weak to moderate because the extraction confidence is low and the available evidence appears to be centered on a PDD with several missing or unclear references. The comments request a PDF version, proof of ownership, project owner/developer identification, and multiple methodological clarifications. These gaps suggest the file set is incomplete for a high-confidence assessment.

Overall

The project scores in the middle because it has some substantive strengths, especially VVB-confirmed additionality and a stated leakage treatment, but the evidence base is incomplete and partly inconsistent. I privileged the PDD dated 2025-01-22 over the later unknown-source notes where they conflicted, because it is the dated primary document; that means I treated FPIC as not conducted in the PDD despite a later note suggesting otherwise, and I kept leakage as quantified because the PDD is more specific than the later note saying it was deemed negligible. The contradictions and low extraction confidence materially reduce reliability, and the missing ownership/CORSIA evidence keeps the project from scoring higher.

Audit Analysis

The project has some strengths on paper, including VVB-confirmed additionality and a quantified leakage treatment, but the record is weakened by missing ownership evidence, unclear CORSIA compliance, and low extraction confidence. The documentation also shows contradictions on FPIC and leakage justification, which reduces reliability and raises caution on claim safety.

Project Description

Status: validated Methodology: ACM0002 Sector: Energy industries Type: Avoidance / Reduction Proponent: Olgu Enerji Yatırım Üretim ve Ticaret A.S. The Albay Cigiltepe WPP Capacity Addition Project is an increase capacity addition wind power plant, located in Afyonkarahisar Province, Turkey owned by Olgu Enerji Yatırım Üretim ve Ticaret A.Ş. The generation license of the project was issued by the Energy Market Regulatory Authority (EMRA) on 16/03/2011 for 49 years. The project has an installed capacity of 85.25 MWm/57.60 MWe. The annual emission reduction estimated by the project is 127,915 tonnes of CO2.

Red Flags

  • The documentation asks for proof of ownership, project owner/developer identification, and CORSIA compliance evidence, suggesting important registry and claim-supporting gaps.
  • There is a contradiction on FPIC and another on leakage treatment, and the extraction confidence is low, so the record is not fully reliable.

Credit Vintages

Issued Retired Available
2016
9,111 0 9,111
2017
127,915 0 127,915
2018
127,915 0 127,915
2019
127,915 0 127,915
2020
127,915 0 127,915
2021
127,915 0 127,915
2022
127,915 0 127,915
2023
127,915 0 127,915
2024
127,915 0 127,915
2025
127,915 0 127,915
2026
118,803 0 118,803
Total 1,279,149 0 1,279,149

Cosa migliorerebbe questo punteggio

  • Provide a complete PDF evidence pack with the PDD, ownership proof, project owner/developer registry details, and the missing verification/validation references.
  • Clarify CORSIA and CCP status, document FPIC and other safeguards consistently, and add explicit reversal, buffer, and monitoring evidence.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No buffer pool or reversal treatment stated

Leakage

Quantified but 0% deduction

Baseline

Project baseline, reassessment timing limited

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA eligibility stated, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti