GS-3510 ↗ · current registry ID: GS11466

#158of 202 in Industrial#9of 12 in Cambodia#375of 426 in Gold Standard (GS)

4.2/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
4.0
Documentation
4.5

Audit Analysis

The Anakot Thmei Safe Water Project in Cambodia is a Gold Standard energy-efficiency project with VVB-confirmed additionality and a quantified 5% leakage deduction, but the verification report lists over 30 material findings and 12 corrective actions, indicating substantial data-quality and methodological weaknesses. Multiple contradictions between the PDD, validation report, and verification report — particularly a 100× discrepancy in the fNRB value and a doubling of the claimed ERR — raise serious over-crediting concerns. The project's safeguards framework (FPIC, grievance mechanism) is documented, but the overall evidentiary base is fragile.

Red Flags

  • Over 30 material findings and 12 corrective actions required in the verification report, including incorrect formulas, missing units, missing evidence for rehabilitated technologies, and missing internal test reports
  • fNRB value contradicts between documents: 52.03 in the verification report (2026) versus 0.5203 in the validation report (2024) — a 100× discrepancy that could materially alter the credit quantity
  • Total ERR claimed in the verification report (12,907) is more than double the figure in the validation report (6,225), and the verified ERR (12,434) is roughly four times the pro-rata expectation for the elapsed monitoring period
  • Buffer pool percentage not stated in any available document, leaving permanence risk unaddressed
  • Usage rate of 0.95 is assumed but not independently verified in the monitoring data

Credit Vintages

IssuedRetiredAvailable
2021
1,60801,608
2022
4,54204,542
2023
6,28406,284
Total12,434012,434

Risk Indicators

Additionality

VVB-confirmed but test type not specified

Permanence

Buffer pool not documented; no reversal events reported

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents