Audit Analysis
The Anemon Intepe Wind Farm is a Gold Standard wind project with a VVB-confirmed combined additionality test and smart-meter-based monitoring, but its integrity is moderated by a project-specific baseline (contradicting an earlier jurisdictional classification), a 0% leakage deduction justified only as 'negligible,' and a history of numerous data-calculation errors that required corrective action. The project is an avoidance-type wind facility with minimal permanence risk, though a one-day forest-fire shutdown was reported. Overall, the project is credible but carries moderate documentation and MRV-quality concerns.
Red Flags
- Baseline method is recorded as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2013 report — the applicable baseline basis is ambiguous across documents.
- FPIC was not conducted, despite the project operating in a community-adjacent wind farm in Turkey.
- Multiple monitoring-report data errors (omitted months, meter-reading discrepancies, duplicated training records) required corrective action before verification could be issued.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
- Buffer pool percentage is not stated in the extracted record, leaving the permanence safeguard mechanism unconfirmed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 37,270 | 37,270 | 0 | |
| 2008 | 61,596 | 61,596 | 0 | |
| 2009 | 59,124 | 59,124 | 0 | |
| 2010 | 57,867 | 57,867 | 0 | |
| 2011 | 62,662 | 62,662 | 0 | |
| 2012 | 62,896 | 62,896 | 0 | |
| 2013 | 16,808 | 16,808 | 0 | |
| 2022 | 26,575 | 0 | 26,575 | |
| 2023 | 53,811 | 0 | 53,811 | |
| 2024 | 61,743 | 0 | 61,743 | |
| Total | 500,352 | 358,223 | 142,129 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project; 1-day fire event; buffer pool not stated
0% deduction, 'negligible' justification; earlier report sai
Project-specific per 2025 report; 2013 report said jurisdict
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →