GSWindTurkeyACM0002

*Anemon Intepe Wind Farm, Turkey

GS-1669 ↗ · current registry ID: GS347

#58of 770 in Renewable energy#16of 121 in Turkey#21of 426 in Gold Standard (GS)#40of 383 in ACM0002

6.4/ 10
Integrity
6.5
Transparency
6.5
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The Anemon Intepe Wind Farm is a Gold Standard wind project with a VVB-confirmed combined additionality test and smart-meter-based monitoring, but its integrity is moderated by a project-specific baseline (contradicting an earlier jurisdictional classification), a 0% leakage deduction justified only as 'negligible,' and a history of numerous data-calculation errors that required corrective action. The project is an avoidance-type wind facility with minimal permanence risk, though a one-day forest-fire shutdown was reported. Overall, the project is credible but carries moderate documentation and MRV-quality concerns.

Red Flags

  • Baseline method is recorded as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2013 report — the applicable baseline basis is ambiguous across documents.
  • FPIC was not conducted, despite the project operating in a community-adjacent wind farm in Turkey.
  • Multiple monitoring-report data errors (omitted months, meter-reading discrepancies, duplicated training records) required corrective action before verification could be issued.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
  • Buffer pool percentage is not stated in the extracted record, leaving the permanence safeguard mechanism unconfirmed.

Credit Vintages

IssuedRetiredAvailable
2007
37,27037,2700
2008
61,59661,5960
2009
59,12459,1240
2010
57,86757,8670
2011
62,66262,6620
2012
62,89662,8960
2013
16,80816,8080
2022
26,575026,575
2023
53,811053,811
2024
61,743061,743
Total500,352358,223142,129

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project; 1-day fire event; buffer pool not stated

Leakage

0% deduction, 'negligible' justification; earlier report sai

Baseline

Project-specific per 2025 report; 2013 report said jurisdict

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents