AVOIDANCE OF METHANE EMISSION THROUGH VERMICOMPOST GENERATION IN THE TEA ESTATES OF AMALGAMATED PLANTATIONS PVT LTD (APPL), ASSAM AND NORTH BENGAL, INDIA
#51of 203 in Industrial#168of 385 in India#299of 632 in Verra (VCS)#6of 13 in AMS-III.F
Audit Analysis
A VCS waste-avoidance project (vermicompost from tea estate waste) with VVB-confirmed investment-test additionality and no material findings, but weakened by a 0% leakage deduction that the VVB itself flagged as 'not addressed,' the absence of a buffer pool, and a project-specific modeled baseline. Multiple contradictions across the PDD and monitoring report introduce data-reliability concerns that temper confidence in the 142 tCO₂e verified figure.
Red Flags
- Leakage deduction of 0% with the VVB's verification report stating the issue was 'not addressed' rather than justified as negligible — a gap in a project where diverted or mismanaged compost could generate uncounted emissions
- No buffer pool or permanence mechanism identified in any available document, leaving no financial backstop against potential reversal
- Seven contradictions across the PDD (2024 vs 2025 versions) and the monitoring report, including a shift in additionality test type (common-practice → investment) and a 41% reduction in claimed ERR (243 → 142), raising questions about the stability of the project's quantification basis
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
No buffer pool; no reversals reported
0% deduction, VVB notes not addressed
Project-specific, modeled, no reassessment date
FPIC, grievance mechanism, benefit sharing confirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →