Audit Analysis
A CDM biomass power project in Tamil Nadu with a solid combined additionality test confirmed by TÜV SÜD and a defensible jurisdictional baseline. The main weaknesses are gaps in verified emissions data, missing FNRB and usage-rate documentation, and a notable discrepancy between two monitoring reports on the lifetime ERR figure. Overall a reasonably well-structured project with moderate data transparency.
Red Flags
- Lifetime ERR differs by more than 2× between the 2011 monitoring report (32,490 tCO2e) and the 2013 monitoring report (70,297 tCO2e) with no stated explanation for the recalculation
- Verified ERR for the monitoring period (2011–2012) is not stated in the extracted record, making it impossible to confirm actual delivery against the pro-rata expectation
- Grid emission factor is from 2008 and no baseline reassessment data is available in the documents reviewed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 32,941 | 0 | 32,941 | |
| 2012 | 32,490 | 0 | 32,490 | |
| 2014 | 70,297 | 0 | 70,297 | |
| Total | 135,728 | 0 | 135,728 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible with surplus-biomass justification
Jurisdictional grid EF baseline
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →