Skip to main content
CDMBiomass EnergyIndiaAMS-I.D

Biomass based power project at T-Kallupatti village, Madurai District, Tamil Nadu, India

CDM-2941 ↗

#5of 352 in Biomass#63of 975 in India#76of 1459 in CDM (UNFCCC)#46of 806 in AMS-I.D

6.5/ 10
Integrity
7.5
Transparency
5.5
Claim Safety
6.0
Documentation
7.0

Audit Analysis

A CDM biomass power project in Tamil Nadu with a solid combined additionality test confirmed by TÜV SÜD and a defensible jurisdictional baseline. The main weaknesses are gaps in verified emissions data, missing FNRB and usage-rate documentation, and a notable discrepancy between two monitoring reports on the lifetime ERR figure. Overall a reasonably well-structured project with moderate data transparency.

Red Flags

  • Lifetime ERR differs by more than 2× between the 2011 monitoring report (32,490 tCO2e) and the 2013 monitoring report (70,297 tCO2e) with no stated explanation for the recalculation
  • Verified ERR for the monitoring period (2011–2012) is not stated in the extracted record, making it impossible to confirm actual delivery against the pro-rata expectation
  • Grid emission factor is from 2008 and no baseline reassessment data is available in the documents reviewed

Credit Vintages

IssuedRetiredAvailable
2011
32,941032,941
2012
32,490032,490
2014
70,297070,297
Total135,7280135,728

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible with surplus-biomass justification

Baseline

Jurisdictional grid EF baseline

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents