Erzurum Hinis Solar Power Plant
#142of 770 in Renewable energy#31of 121 in Turkey#169of 629 in Verra (VCS)#44of 417 in AMS-I.D
Audit Analysis
The Erzurum Hinis Solar Power Plant is a straightforward renewable energy avoidance project with VVB-confirmed additionality and no reversal risk, but its integrity is undermined by the absence of FPIC, a grievance mechanism, and any documented safeguards in the most recent verification report. Leakage is set at 0% with no justification provided, and eight contradictions between documents—particularly the regression of safeguards and leakage findings between the November and December 2025 verification reports—raise data-reliability concerns. The core carbon accounting is sound, with claimed and verified ERR matching at 15,951 tCO₂e for the 2023–2025 monitoring period.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the 2025 verification report, a regression from the 2023 report which stated leakage was quantified
- Eight contradictions between documents, including FPIC, grievance mechanism, safeguards, and benefit-sharing all flipping from 'present' (Nov 2025) to 'absent' (Dec 2025) within the same verification report cycle
- Six corrective action requests (CAR-1 through CAR-6) plus four additional specific actions required, indicating unresolved compliance gaps at the time of verification
- Baseline method contradicted between the verification report ('project') and the monitoring report ('jurisdictional'), both dated 2025-11-19
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 7,445 | 0 | 7,445 | |
| 2020 | 8,056 | 0 | 8,056 | |
| 2021 | 8,125 | 0 | 8,125 | |
| 2022 | 7,691 | 0 | 7,691 | |
| 2023 | 7,729 | 0 | 7,729 | |
| 2024 | 7,944 | 0 | 7,944 | |
| 2025 | 2,191 | 0 | 2,191 | |
| Total | 49,181 | 0 | 49,181 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification not addressed
Project-specific, no reassessment date stated
No FPIC, grievance, or benefit-sharing in final report
CORSIA-ineligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →