Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredAMS-I.D

Erzurum Hinis Solar Power Plant

VCS-1913 ↗

#142of 770 in Renewable energy#31of 121 in Turkey#169of 629 in Verra (VCS)#44of 417 in AMS-I.D

6.0/ 10
Integrity
5.5
Transparency
6.5
Claim Safety
6.5
Documentation
5.5

Audit Analysis

The Erzurum Hinis Solar Power Plant is a straightforward renewable energy avoidance project with VVB-confirmed additionality and no reversal risk, but its integrity is undermined by the absence of FPIC, a grievance mechanism, and any documented safeguards in the most recent verification report. Leakage is set at 0% with no justification provided, and eight contradictions between documents—particularly the regression of safeguards and leakage findings between the November and December 2025 verification reports—raise data-reliability concerns. The core carbon accounting is sound, with claimed and verified ERR matching at 15,951 tCO₂e for the 2023–2025 monitoring period.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2025 verification report, a regression from the 2023 report which stated leakage was quantified
  • Eight contradictions between documents, including FPIC, grievance mechanism, safeguards, and benefit-sharing all flipping from 'present' (Nov 2025) to 'absent' (Dec 2025) within the same verification report cycle
  • Six corrective action requests (CAR-1 through CAR-6) plus four additional specific actions required, indicating unresolved compliance gaps at the time of verification
  • Baseline method contradicted between the verification report ('project') and the monitoring report ('jurisdictional'), both dated 2025-11-19

Credit Vintages

IssuedRetiredAvailable
2019
7,44507,445
2020
8,05608,056
2021
8,12508,125
2022
7,69107,691
2023
7,72907,729
2024
7,94407,944
2025
2,19102,191
Total49,181049,181

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, no reassessment date stated

Safeguards

No FPIC, grievance, or benefit-sharing in final report

Double-claim

CORSIA-ineligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents