Skip to main content
CDMBiomass EnergyBrazilAMS-I.D

BK Energia Itacoatiara Project

CDM-0168 ↗

#59of 196 in Biomass#44of 104 in Brazil#100of 213 in CDM (UNFCCC)#112of 417 in AMS-I.D

5.0/ 10
Integrity
5.0
Transparency
4.8
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The BK Energia Itacoatiara biomass energy project (CDM-0168) is a straightforward avoidance-type project using standardised AMS methodologies, but the verification record reveals 16 material findings and 16 corrective actions spanning PDD documentation, monitoring plan gaps, and tool application errors. Key data gaps include the absence of a verified ERR figure, unconfirmed VVB additionality verification, and contradictory leakage justifications between the validation and monitoring reports. The project is functional but carries moderate documentation and data-reliability concerns.

Red Flags

  • 16 material findings and 16 corrective actions identified in the monitoring report (2021), including missing freight-emission tool, incomplete monitoring provisions for parameters MC,y and Wx, and inconsistent PDD references to the wrong crediting period
  • Contradiction in leakage treatment: the validation report (2017) characterises leakage as 'deemed negligible' while the monitoring report (2021) states it was 'quantified', yet the deduction remains 0% in both cases
  • Total ERR claimed differs between the PDD (47,029 tCO₂e) and the monitoring report (40,776 tCO₂e), with no verified ERR figure available to reconcile the two
  • Additionality test type is recorded as 'combined' but VVB confirmation of the additionality assessment is not found in the extracted record
  • Grid emission factor of 0.768 tCO₂/MWh is drawn from 2015 data, which is six years before the monitoring period and may not reflect current grid conditions in the Itacoatiara region

Credit Vintages

IssuedRetiredAvailable
2006
512,3850512,385
2007
121,1660121,166
2008
141,7890141,789
2009
166,8910166,891
2011
105,9300105,930
2013
152,7560152,756
2014
48,040048,040
2016
90,687090,687
2017
47,382047,382
2019
34,719034,719
2020
30,478030,478
2021
80,045080,045
Total1,532,26801,532,268

Risk Indicators

Additionality

Combined test present; VVB confirmation not found in record

Permanence

Avoidance project; no reversal risk or events

Leakage

0% deduction; contradictory justifications across documents

Baseline

Project-specific modeled baseline; reassessed 2021

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk unconfir

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D; AMS-III.E

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents