BK Energia Itacoatiara Project
#59of 196 in Biomass#44of 104 in Brazil#100of 213 in CDM (UNFCCC)#112of 417 in AMS-I.D
Audit Analysis
The BK Energia Itacoatiara biomass energy project (CDM-0168) is a straightforward avoidance-type project using standardised AMS methodologies, but the verification record reveals 16 material findings and 16 corrective actions spanning PDD documentation, monitoring plan gaps, and tool application errors. Key data gaps include the absence of a verified ERR figure, unconfirmed VVB additionality verification, and contradictory leakage justifications between the validation and monitoring reports. The project is functional but carries moderate documentation and data-reliability concerns.
Red Flags
- 16 material findings and 16 corrective actions identified in the monitoring report (2021), including missing freight-emission tool, incomplete monitoring provisions for parameters MC,y and Wx, and inconsistent PDD references to the wrong crediting period
- Contradiction in leakage treatment: the validation report (2017) characterises leakage as 'deemed negligible' while the monitoring report (2021) states it was 'quantified', yet the deduction remains 0% in both cases
- Total ERR claimed differs between the PDD (47,029 tCO₂e) and the monitoring report (40,776 tCO₂e), with no verified ERR figure available to reconcile the two
- Additionality test type is recorded as 'combined' but VVB confirmation of the additionality assessment is not found in the extracted record
- Grid emission factor of 0.768 tCO₂/MWh is drawn from 2015 data, which is six years before the monitoring period and may not reflect current grid conditions in the Itacoatiara region
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 512,385 | 0 | 512,385 | |
| 2007 | 121,166 | 0 | 121,166 | |
| 2008 | 141,789 | 0 | 141,789 | |
| 2009 | 166,891 | 0 | 166,891 | |
| 2011 | 105,930 | 0 | 105,930 | |
| 2013 | 152,756 | 0 | 152,756 | |
| 2014 | 48,040 | 0 | 48,040 | |
| 2016 | 90,687 | 0 | 90,687 | |
| 2017 | 47,382 | 0 | 47,382 | |
| 2019 | 34,719 | 0 | 34,719 | |
| 2020 | 30,478 | 0 | 30,478 | |
| 2021 | 80,045 | 0 | 80,045 | |
| Total | 1,532,268 | 0 | 1,532,268 |
Risk Indicators
Combined test present; VVB confirmation not found in record
Avoidance project; no reversal risk or events
0% deduction; contradictory justifications across documents
Project-specific modeled baseline; reassessed 2021
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unconfir
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →