Bundled Solar Power Project by D.J. Malpani and Giriraj Enterprises

VCS-1670 ↗

5.2 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
6.3

Score Breakdown

Integrity

verified Additionality is confirmed by the VVB using an investment test (monitoring/verification documentation set).

missing Baseline is project-specific and baseline reassessment timing is not stated; leakage is applied as 0% while justification is inconsistent across documents.

Transparency

verified VVB is identified (VKU Certification Pvt. Ltd.) and monitoring period is clearly stated (2021-07-01 to 2022-03-31) in the monitoring report (2022-11-15).

missing Claimed vs verified ERs differ materially (89,423 claimed vs 71,267 verified in extracted record), and extensive CARs indicate MRV quality issues.

Claim Safety

verified Uses a standard grid-connected renewable methodology (ACM0002 v17.01) with a stated grid emission factor (0.9777).

missing CORSIA/CCP status is not stated in available documents and ER figures/leakage treatment contradictions increase over-crediting and greenwashing risk.

Documentation

verified Document set is relatively broad (PDD, monitoring report, validation report, issuance) with many sources used (34) and high extraction confidence.

missing Monitoring report (2022-11-15) contains numerous corrective actions and missing supporting evidence (e.g., calibration certificates, commissioning support, stakeholder communication records).

Detailed Analysis

Integrity

The monitoring documentation indicates additionality was confirmed by the VVB using an investment test, which supports additionality robustness. The baseline is described as project-specific, and the timing of any baseline reassessment is not stated in the extracted record, which weakens baseline robustness. Leakage is applied as a 0% deduction, but the monitoring report (2022-11-15) does not address leakage while a validation report (2020-04-20) reportedly quantified it, reducing confidence in the integrity of the accounting.

Transparency

The monitoring report (2022-11-15) clearly states the monitoring period (2021-07-01 to 2022-03-31) and identifies the VVB as VKU Certification Pvt. Ltd. Transparency is reduced by the large gap between claimed and verified emission reductions in the extracted record (89,423 claimed vs 71,267 verified) and by extensive corrective actions indicating incomplete or inconsistent MRV evidence (e.g., missing calibration certificates and inconsistencies in period/generation inclusion). Public-facing completeness is also weakened by references to non-working weblinks noted in corrective actions.

Claim Safety

As an avoidance renewable energy project under ACM0002 (v17.01), the main claim risk is over-crediting from MRV weaknesses rather than permanence. The monitoring report corrective actions include issues directly tied to quantification (meter calibration evidence gaps and generation data inclusion inconsistencies), which elevates over-crediting risk. CORSIA eligibility and CCP status are not stated in available documents, increasing uncertainty for downstream claims and buyer labeling.

Documentation

The extracted record indicates a reasonably complete document set (PDD, monitoring report, validation report, issuance) and a high extraction confidence, supporting a mid-range documentation score. However, the monitoring report (2022-11-15) lists many corrective actions, including missing commissioning support, incomplete calibration certificates for the monitoring period, and missing stakeholder communication/grievance evidence, indicating documentation quality problems at the project level. These issues suggest that while many documents exist, key evidentiary attachments and internal consistency were initially insufficient.

Overall

Overall scoring is pulled down by repeated inconsistencies across documents and extensive corrective actions affecting core quantification and eligibility assurances. For contradictions: (1) For claimed ERs, two validation reports conflict (100,718 in 2019-05-18 vs 89,423 in 2020-04-20); the later value (89,423) is privileged as more recent, but the inconsistency reduces confidence. (2) Leakage justification is 'not addressed' in the monitoring report (2022-11-15) but 'quantified' in the validation report (2020-04-20); the monitoring report is privileged for the monitored period disclosure, and the mismatch triggers a penalty. (3) Verified ERs conflict (48,803 in 2021-09-17 vs 71,267 in 2023-01-06); the later value (71,267) is privileged as more recent, but the spread indicates reliability risk. (4) Crediting period differs (2015-05-31—unspecified end in 2019-05-18 vs 2015-03-31—2025-03-30 in the monitoring report 2022-11-15); the monitoring report is privileged as more complete and recent, but the discrepancy still lowers confidence.

Audit Analysis

This is a VCS bundled solar project using ACM0002 with additionality confirmed by the VVB, and no reversal events reported. However, multiple document inconsistencies (including emission reduction figures and crediting period) and extensive corrective actions in the monitoring report raise reliability and over-crediting concerns. Leakage treatment is also inconsistent across documents, weakening confidence in the quantified results.

Project Description

The project involves installation and operation of 56.25 MW (16.25 MW and 40 MW) solar power project in the village of Hoti in Medak, in the state of Telangana and the Sengottai in Virudhunagar in Tamil Nadu. The purpose of the project activity is to generate power using renewable energy (solar energy) which will feed into the power generated to the state grid in India. Since, the solar power is Green House Gas (GHG) emissions free, the power generated will replace anthropogenic emissions of greenhouse gases estimated to be approximately 93,022 tCO2e per year, and displacing 95,145 MWh/year of electricity from the generation-mix of power plants connected to the Indian Grid, which is mainly dominated by thermal/ fossil fuel-based power. The total installed capacity of the current project activity is 56.25 MW; which involves operation of solar power plants in the states of Tamil Nadu and Telangana in India.

Red Flags

  • Large inconsistencies in verified/claimed emission reduction figures across reports, indicating data reliability risk
  • Monitoring report lists numerous corrective actions, including missing calibration certificates and inconsistencies in monitoring period and generation data inclusion
  • Leakage treatment is inconsistent (quantified in a validation report but not addressed in the monitoring report) while a 0% leakage deduction is applied
  • Double-counting safeguards rely on missing/late-submitted declarations and undertakings per corrective actions

Credit Vintages

Issued Retired Available
2015
34,012 33,999 13
2016
93,647 93,647 0
2017
127,331 125,917 1,414
2018
75,015 72,015 3,000
2019
98,101 98,031 70
2020
94,925 94,925 0
2021
94,018 78,851 15,167
2022
26,052 19,562 6,490
Total 643,101 616,947 26,154

Cosa migliorerebbe questo punteggio

  • Publish a clean, internally consistent monitoring/verification package with resolved CARs, including complete meter calibration certificates for the full monitoring period and clear treatment of partial-month/apportionment issues.
  • Clarify and harmonize leakage treatment across the validation and monitoring documentation (explicit justification for 0% leakage or quantified deduction) and provide a robust double-counting attestation aligned with registry requirements.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversals reported

Leakage

0% deduction with inconsistent justification

Baseline

Project-specific baseline; reassessment timing unclear

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated; declarations flagged in CARs

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti