Chi Khe Hydropower Project
#85of 1935 in Renewable energy#4of 80 in Vietnam#50of 1459 in CDM (UNFCCC)#56of 1287 in ACM0002
Audit Analysis
The Chi Khe Hydropower Project is a straightforward small-hydro CDM project with a jurisdictional baseline, VVB-confirmed investment additionality, and no reversal risk inherent to the technology. The main concerns are a contradiction in how leakage is justified across documents, three material findings with one open corrective action, and the absence of any stated CORSIA or CCP eligibility. Overall the project is low-risk but documentation gaps and the unresolved leakage inconsistency prevent a higher rating.
Red Flags
- Leakage justification is contradictory: the monitoring report (2022) states leakage was 'quantified' while the validation report (same date) states it was 'deemed negligible' — both supporting a 0% deduction, but the basis is inconsistent.
- Three material findings were raised by the VVB (compliance clarification, APJ monitoring documentation, GWP values for post-2020), with one corrective action still open.
- No buffer pool, permanence mechanism, or reversal-risk mitigation is documented, though this is less critical for a hydro project.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Hydro – no reversal risk
0% deduction, contradictory justification
Jurisdictional, reassessed 2022
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →