CO2 Utilization in Concrete – Removals & Reductions – CarbonCure – U.S & Canada Project #1
#1of 5 in Bolivia#433of 629 in Verra (VCS)
Audit Analysis
A CarbonCure CO2-utilization project under VCS methodology VM0043 with VVB-confirmed additionality and no material findings, but undermined by eight inter-document contradictions, a 0% leakage deduction with no stated justification, an unconfirmed buffer pool, and a striking country mismatch (registered in Bolivia but named 'U.S & Canada Project #1'). Data reliability is a significant concern that limits confidence in the credit figures.
Red Flags
- Country mismatch: project name references 'U.S & Canada' but registry country is Bolivia — either a data-extraction error or a registration anomaly requiring clarification
- Eight contradictions across documents, including conflicting FPIC, grievance mechanism, safeguards, and benefit-sharing statuses between two verification reports dated 2025-04-07 and 2025-06-06
- Leakage deduction of 0% with justification recorded as 'not_addressed' in the verification report, while the PDD states 'deemed_negligible' — inconsistent treatment
- Buffer pool percentage not stated in any available document, leaving permanence risk unquantified
- ERR figures conflict: PDD reports 8,147 tCO2 while the monitoring report and verification report report 14,443 tCO2, with no clear reconciliation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 2,009 | 460 | 1,549 | |
| 2023 | 5,997 | 100 | 5,897 | |
| 2024 | 9,009 | 0 | 9,009 | |
| 2025 | 5,181 | 0 | 5,181 | |
| Total | 22,196 | 560 | 21,636 |
Risk Indicators
VVB-confirmed combined test
Buffer pool not stated; no reversal data
0% deduction, justification inconsistent
Project-specific; reassessment timing not stated
Contradicted across two verification reports
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →