Audit Analysis
The Dağpazarı Wind Power Plant is a Gold Standard wind project with a confirmed investment-test additionality and no reversal risk inherent to its avoidance-type design. However, the project-specific baseline, a fixed 2018 grid emission factor, low extraction confidence across 27 documents, and ten inter-document contradictions introduce moderate uncertainty into the credit quality. The verified emission reductions align closely with pro-rata expectations, suggesting no material over-crediting.
Red Flags
- Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of extracted figures
- Ten contradictions between documents (including baseline method, additionality test type, and ERR figures) indicate data reliability issues
- 30 Corrective Action Requests and 2 Clarification Requests were raised during the most recent verification, all closed but indicating significant documentation gaps
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- Grid emission factor fixed at the 2018 value (0.6198 tCO2/MWh) without evidence of periodic update
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 34,035 | 34,030 | 5 | |
| 2013 | 67,288 | 67,288 | 0 | |
| 2014 | 53,835 | 53,835 | 0 | |
| 2015 | 64,710 | 64,709 | 1 | |
| 2016 | 67,477 | 66,977 | 500 | |
| 2017 | 55,695 | 55,195 | 500 | |
| 2018 | 46,971 | 33,779 | 13,192 | |
| 2020 | 50,081 | 0 | 50,081 | |
| 2021 | 74,476 | 0 | 74,476 | |
| 2022 | 69,573 | 0 | 69,573 | |
| 2023 | 11,979 | 0 | 11,979 | |
| Total | 596,120 | 375,813 | 220,307 |
Risk Indicators
Investment test, VVB-confirmed
Avoidance project, no reversal risk
0% justified as negligible for wind
Project-specific, reassessed 2020
FPIC, grievance mechanism, ESIA documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →