Skip to main content
GSWindThailandACM0002

Chaiyaphum Wind Farm Power Project

GS-2038 ↗ · current registry ID: GS7550

#429of 770 in Renewable energy#16of 22 in Thailand#350of 426 in Gold Standard (GS)#313of 383 in ACM0002

4.5/ 10
Integrity
4.2
Transparency
4.5
Claim Safety
5.0
Documentation
4.2

Audit Analysis

The Chaiyaphum Wind Farm is a Gold Standard wind project with VVB-confirmed additionality and inherently low permanence risk, but its credibility is undermined by seven corrective actions, a major crediting-period discrepancy between the PDD and verification report, and a significant gap in verified emission reduction figures. Multiple contradictions across documents (baseline method, leakage justification, safeguards, FPIC) reduce confidence in the data record. The project is functional but its documentation quality and internal consistency fall well below best practice.

Red Flags

  • Crediting period stated as 2020-2025 in the verification report but 2021-2036 in the PDD — a 10-year discrepancy that the monitoring report itself flags as a corrective action
  • Seven corrective actions required in the verification report, including missing grievance register records, missing meter calibration data, and missing SDG indicator evidence
  • Total ERR claimed of 129,784 tCO₂e in the monitoring report versus 70,598 tCO₂e in the PDD — an 84% discrepancy that cannot be reconciled without knowing the exact crediting-period basis
  • No verified ERR figure is available in the extracted record, making independent over- or under-delivery assessment impossible
  • No buffer pool percentage stated, leaving no quantified permanence safeguard despite the absence of a formal reversal-risk assessment in the verification report

Credit Vintages

IssuedRetiredAvailable
2020
61,65339,76921,884
2021
71,29712,93058,367
2022
6,7781356,643
Total139,72852,83486,894

Risk Indicators

Additionality

VVB-confirmed, test type unspecified

Permanence

Low inherent risk (wind) but no buffer pool stated

Leakage

0% deduction, justification inconsistent across docs

Baseline

Method contradictory; grid EF from 2016

Safeguards

FPIC and grievance mechanism present but records incomplete

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents