Skip to main content
VCSEnergy industries (renewable/non-renewable sources)United States Registry: RegisteredACM0002

Dempsey Ridge Wind Project

VCS-780 ↗

#239of 770 in Renewable energy#11of 115 in United States#279of 629 in Verra (VCS)#185of 383 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Dempsey Ridge Wind Project is a registered VCS renewable energy project with verified additionality and no reversal events, but it carries significant documentation and monitoring quality concerns reflected in over ten corrective actions across multiple verification cycles. The 0% leakage deduction lacks any stated justification, and the project-specific baseline (rather than a jurisdictional one) introduces moderate over-crediting risk. Overall, the project is functional but shows recurring compliance gaps that temper confidence in its credit quality.

Red Flags

  • Ten or more corrective actions were issued across verification cycles, including missing 2016 generation data, incorrect net electricity values in monitoring reports, and inadequate QA/QC provisions in the monitoring plan
  • Leakage deduction is 0% with the justification recorded as 'not addressed' in the 2021 verification report, despite an earlier 2014 verification report describing it as 'quantified'
  • Revenue meter calibration evidence was missing for the 2020 monitoring period (material finding in the 2021 verification report)
  • No buffer pool percentage is stated in any available document, and the project-specific baseline has no recorded reassessment date

Credit Vintages

IssuedRetiredAvailable
2012
202,924202,9240
2013
255,689255,6890
2014
288,749288,7490
2015
249,424249,4240
2016
275,309275,3090
2017
206,660161,31145,349
2018
231,795184,63047,165
2019
222,228210,72811,500
2020
223,436180,51842,918
Total2,156,2142,009,282146,932

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind energy, no reversal risk

Leakage

0% deduction, no justification stated

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance inconsistent

Double-claim

CORSIA excluded, CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents