Escuela de Minas Hydroelectric Project

VCS-1723 ↗

#52of 770 in Renewable energy#2of 18 in Colombia#67of 629 in Verra (VCS)#35of 383 in ACM0002

6.5/ 10
Integrity
6.8
Transparency
6.2
Claim Safety
6.3
Documentation
6.8

Audit Analysis

The Escuela de Minas hydroelectric project is a registered VCS renewable energy project with a solid additionality assessment (combined test, VVB-confirmed) and no reversal risk inherent to its avoidance-type design. However, the most recent verification report flags a 0% leakage deduction with no stated justification, the grid emission factor dates to 2016, and three corrective actions were raised regarding ER calculation conservatism and calibration records. Multiple contradictions across documents—particularly on safeguards, FPIC, and leakage treatment—reduce confidence in the consistency of the project record.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report (Dec 2025), while an earlier report (Sep 2024) stated it was 'quantified'—the more recent and authoritative document indicates the issue was left unaddressed
  • Grid emission factor of 0.3105 tCO2/MWh is from 2016; if Colombia's grid has decarbonised since then, the claimed avoided emissions may be overstated
  • Three corrective actions in the latest verification report: incomplete SDG 8 jobs evidence, unclear application of conservative data in ER calculations, and missing/incorrect calibration certificates for the energy meter
  • Crediting period end date is 'not stated' in the most recent verification report, though an earlier report (Nov 2022) records it as 2029-07-21

Credit Vintages

IssuedRetiredAvailable
2019
24,67624,6760
2020
65,87963,8911,988
2021
104,65036,09268,558
2022
112,8320112,832
2023
67,065067,065
2024
62,098062,098
Total437,200124,659312,541

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification not addressed (latest report)

Baseline

Project-specific, grid EF from 2016, method contradicted

Safeguards

FPIC/grievance/benefit sharing confirmed in latest report bu

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents