Skip to main content
CDMWindChinaACM0002

Fujian Zhangpu Liuao 3rd phase Wind Power Project

CDM-2589 ↗

#766of 1935 in Renewable energy#377of 1084 in China#544of 1459 in CDM (UNFCCC)#594of 1287 in ACM0002

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM wind power project in Fujian, China, with VVB-confirmed additionality and a jurisdictional baseline, but a significant discrepancy between the PDD (264,187 tCO2e) and the validation report (37,741 tCO2e) raises data-reliability concerns. Several key fields (additionality test type, FNRB, monitoring method, CORSIA/CCP status) are not stated in the available documents, limiting full assessment. No material findings or corrective actions were reported.

Red Flags

  • PDD (2019-10-19) reports a total emission reduction of 264,187 tCO2e while the validation report (2019-10-28) states 37,741 tCO2e — a roughly 7-fold discrepancy that undermines confidence in the ex-ante estimate
  • Additionality test type is not specified in any available document despite VVB confirmation, making it impossible to verify which test (investment, regulatory, or barrier) was applied

Credit Vintages

IssuedRetiredAvailable
2011
20,425020,425
2012
75,013075,013
2013
19,283019,283
Total114,7210114,721

Risk Indicators

Additionality

VVB-confirmed (test type not specified)

Permanence

Avoidance project, no reversal events

Leakage

0% deemed negligible, consistent with wind

Baseline

Jurisdictional, reassessed 2019

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents