Gansu Huanghe Chaijiaxia Hydropower Station Project
#10of 770 in Renewable energy#9of 204 in China#19of 629 in Verra (VCS)#8of 383 in ACM0002
Audit Analysis
A VCS-registered hydropower project in China with a jurisdictional baseline, VVB-confirmed investment additionality, and no permanence risk (non-AFOLU). The verified emissions reductions match the claimed figure exactly, and the two minor material findings were resolved without corrective actions. Key gaps include unstated CORSIA/CCP status, absent FPIC documentation, and a verification report dated well after the crediting period ended.
Red Flags
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- FPIC (Free, Prior and Informed Consent) is not documented in the extracted record despite the project operating in a community-adjacent setting in China
- The verification report is dated 7 December 2022, more than four years after the crediting period ended on 8 January 2018, raising questions about the timeliness of the verification cycle
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 154,078 | 154,078 | 0 | |
| 2009 | 3,000 | 3,000 | 0 | |
| 2016 | 10,000 | 0 | 10,000 | |
| Total | 167,078 | 157,078 | 10,000 |
Risk Indicators
VVB-confirmed investment test
Non-AFOLU; no reversal risk
0% – negligible for grid-connected hydro
Jurisdictional grid EF 0.841
Grievance & benefit-sharing present; FPIC not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →