Skip to main content
GSEnergy Efficiency - Transport SectorInternationalGeneral Methodologyv2.1

Golden Union Shipping Retrofit Project 1

GS-4211 ↗ · current registry ID: GS12243

#550of 1329 in Industrial#849of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Golden Union Shipping Retrofit Project 1 is a Gold Standard energy-efficiency project for vessel retrofits with VVB-confirmed additionality and no reported reversal events, but it is undermined by an unaddressed leakage justification, absence of a buffer pool, a project-specific baseline, and extensive PDD documentation deficiencies that required numerous corrective actions. The exact match between claimed and verified emissions reductions (57,035 tCO₂e) is neutral but offers no independent verification signal, and key parameters such as FNRB, usage rates, and CORSIA/CCP status are not stated in the available record.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2024-03-27), contradicting the earlier monitoring report's 'deemed negligible' claim — the more recent and authoritative verification document indicates the issue was never properly resolved.
  • The PDD template was altered from the original, multiple required sections were missing or incomplete, and the verification report lists over 25 corrective actions — indicating significant documentation quality issues at the time of verification.
  • FPIC was not conducted, and the stakeholder consultation record (2021-10-19) contradicts the validation report (2022-09-08) on whether benefit sharing was described.

Credit Vintages

IssuedRetiredAvailable
2020
8,90108,901
2021
31,033031,033
2022
17,101017,101
Total57,035057,035

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

no reversals reported

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; no reassessment data

Safeguards

Grievance mechanism present; FPIC not conducted; PDD gaps

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents