Golden Union Shipping Retrofit Project 1
GS-4211 ↗ · current registry ID: GS12243
#550of 1329 in Industrial#849of 1801 in Gold Standard (GS)
Audit Analysis
The Golden Union Shipping Retrofit Project 1 is a Gold Standard energy-efficiency project for vessel retrofits with VVB-confirmed additionality and no reported reversal events, but it is undermined by an unaddressed leakage justification, absence of a buffer pool, a project-specific baseline, and extensive PDD documentation deficiencies that required numerous corrective actions. The exact match between claimed and verified emissions reductions (57,035 tCO₂e) is neutral but offers no independent verification signal, and key parameters such as FNRB, usage rates, and CORSIA/CCP status are not stated in the available record.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2024-03-27), contradicting the earlier monitoring report's 'deemed negligible' claim — the more recent and authoritative verification document indicates the issue was never properly resolved.
- The PDD template was altered from the original, multiple required sections were missing or incomplete, and the verification report lists over 25 corrective actions — indicating significant documentation quality issues at the time of verification.
- FPIC was not conducted, and the stakeholder consultation record (2021-10-19) contradicts the validation report (2022-09-08) on whether benefit sharing was described.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 8,901 | 0 | 8,901 | |
| 2021 | 31,033 | 0 | 31,033 | |
| 2022 | 17,101 | 0 | 17,101 | |
| Total | 57,035 | 0 | 57,035 |
Risk Indicators
VVB-confirmed barrier test
no reversals reported
0% deduction, justification not addressed
Project-specific; no reassessment data
Grievance mechanism present; FPIC not conducted; PDD gaps
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →