Bitola SPP
GS-4398 ↗ · current registry ID: GS12276
#30of 426 in Gold Standard (GS)#56of 383 in ACM0002
Audit Analysis
The Bitola SPP solar thermal project in North Macedonia demonstrates solid additionality (VVB-confirmed combined test) and conservative emission reduction figures, with verified credits 6.6% below the claimed amount. However, six corrective action requests, a baseline method contradiction between the validation and verification reports, and several unquantified parameters (FNRB, usage rate, buffer pool) limit confidence in the overall robustness of the credit claim.
Red Flags
- Baseline method contradiction: the validation report (Oct 2024) describes a project-specific baseline while the verification report (Aug 2025) states a jurisdictional baseline — the more recent verification report is privileged, but the discrepancy undermines baseline confidence
- Six corrective action requests (CARs) in the verification report, including missing compliance demonstrations, financial analysis gaps, and a capacity inconsistency (54.91 MW vs 55 MW)
- Leakage justification contradiction: the monitoring report describes leakage as 'quantified' while the verification report states it was 'deemed negligible' with a 0% deduction
- No buffer pool percentage stated in any available document, leaving permanence risk unquantified
- FPIC explicitly not conducted (recorded as false), despite safeguards being mentioned
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 10,421 | 0 | 10,421 | |
| 2024 | 48,240 | 0 | 48,240 | |
| Total | 58,661 | 0 | 58,661 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, justification contradicted
Method contradicted across reports
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →