Grid connected bundled wind projects in Gujarat and Tamil Nadu
#1523of 1935 in Renewable energy#843of 975 in India#1303of 1459 in CDM (UNFCCC)#516of 806 in AMS-I.D
Audit Analysis
A CDM wind project in India with a solid jurisdictional baseline and VVB-confirmed additionality, but undermined by five material findings at validation, a seven-fold discrepancy between the PDD's claimed and the VVB-validated emission reductions, and a near-total absence of monitoring data. The project is structurally sound for a wind avoidance project but carries significant documentation and claim-safety concerns.
Red Flags
- The PDD claims 47,635 tCO₂e in emission reductions while the validation report only validates 6,805 tCO₂e — a seven-fold over-claim that was corrected by the VVB but signals weak project documentation discipline
- Five material findings at validation, including confusion between grid names (NEWNE/Southern vs. Unified Indian Grid), a project boundary diagram inconsistent with the applied methodology, and baseline emissions not rounded down for conservative estimation
- No monitoring reports or monitoring period data found in the extracted record despite the crediting period running from January 2020 to December 2026
- Extraction confidence is rated low, indicating at least one key document was poorly readable or incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 37,585 | 0 | 37,585 | |
| Total | 37,585 | 0 | 37,585 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance – minimal reversal risk
0% deemed negligible, not independently quantified
Jurisdictional grid EF 0.9419 (2020)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →