A grid-connected wind energy project in Tamil Nadu with a confirmed investment additionality test and jurisdictional baseline, delivering 239,015 tCO2e over its crediting period. The project under-delivered by approximately 50% relative to its ex-ante estimate, which is conservative but signals estimation inaccuracy. Numerous administrative material findings and 17 corrective actions (including missing proof of title and VCS PD) indicate significant documentation gaps, and FPIC was not conducted.
Red Flags
- FPIC was not conducted for a project operating in India, a jurisdiction with significant indigenous and tribal populations
- 17 corrective actions were required, including missing proof of title (CAR 3) and unsubmitted VCS PD (CAR 1), indicating fundamental documentation gaps at verification
- Actual verified emissions reductions were 50.24% lower than the ex-ante estimate, suggesting the project design assumptions were poorly calibrated to local wind resources
- Contradiction in baseline method: the 2010 validation report describes a project-specific baseline while the 2022 verification report states a jurisdictional baseline
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 599 | 599 | 0 | |
| 2009 | 79,029 | 79,029 | 0 | |
| 2010 | 69,351 | 69,351 | 0 | |
| 2011 | 303 | 303 | 0 | |
| 2012 | 73,668 | 73,668 | 0 | |
| 2013 | 39,028 | 39,028 | 0 | |
| 2014 | 35,163 | 35,163 | 0 | |
| 2015 | 29,356 | 29,356 | 0 | |
| 2016 | 50,936 | 50,936 | 0 | |
| 2017 | 1,932 | 1,932 | 0 | |
| Total | 379,365 | 379,365 | 0 |
Risk Indicators
Investment test confirmed by VVB
Renewable energy – no reversal risk
0% deemed negligible – appropriate for grid wind
Jurisdictional per 2022 VR but contradicted by 2010 validati
Grievance mechanism present but FPIC not conducted
CORSIA excluded; CCP status not stated; CAR 2 raised dual-sc
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →