Climeworks Mammoth is a geologically stored carbon project in Iceland with a VVB-confirmed investment additionality test and a reasonable leakage treatment for its project type. However, the verification report identifies a significant uncertainty calculation error, the absence of a buffer pool, missing safeguards (no FPIC, no grievance mechanism), and multiple documentation gaps that collectively moderate confidence in the credit's robustness.
Red Flags
- Uncertainty was underreported: the verification report notes the value should be 28.07 tCO2eq ±11.59% rather than 13.14 tCO2eq (±46%), indicating a material error in the Root Sum of Squares calculation
- No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated despite a reported reversal event of 0.029 tonnes CO2
- Two verification reports (Dec 2025 and Jan 2026) report materially different ERR figures (278.3 vs 82.3 tonnes), creating uncertainty about the correct verified quantity
- No grievance mechanism and no FPIC process were conducted, despite safeguards being mentioned in the documents
- The risk register did not explicitly address CO2 transport risks and geological storage until corrective action was required
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 77 | 77 | 0 | |
| 2025 | 306 | 306 | 0 | |
| 2026 | 82 | 82 | 0 | |
| Total | 465 | 465 | 0 |
Risk Indicators
VVB-confirmed investment test
Reversal reported, no buffer pool stated
Negligible, reasonable for geological storage
Project-specific, reassessment timing not stated
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →