Oualidia 1&2 Wind Projects.
#712of 1935 in Renewable energy#3of 12 in Morocco#416of 1339 in Verra (VCS)#554of 1287 in ACM0002
Audit Analysis
The Oualidia 1&2 Wind Projects in Morocco are a VCS-registered renewable energy project with a jurisdictional baseline and VVB-confirmed additionality, but the verification report flags a 56% under-delivery against ex-ante estimates, multiple documentation inconsistencies, and eleven corrective actions. The project is not over-crediting, but the gap between projected and actual generation, combined with a 13-month commissioning delay and a meter calibration gap, raises questions about the robustness of the original ex-ante modelling.
Red Flags
- Achieved emissions reductions are 56% lower than ex-ante estimates, as flagged in the verification report material findings
- Eleven corrective actions required by the VVB, including inconsistent IRR inputs, incorrect EF operating margin formula, and exclusion of CDM projects from AEGtotal
- Crediting period end date is not stated in the most recent verification report (only start date 2021-02-10 confirmed)
- Gap in calibrated electricity meters from 10 March to 31 March 2023, requiring a conservative deduction
- Commissioning delayed 13 months (Jan 2020 to Feb 2021) due to supplier bankruptcy, with no deviation recorded in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 8,247 | 8,247 | 0 | |
| 2022 | 33,346 | 33,346 | 0 | |
| 2023 | 32,882 | 8,407 | 24,475 | |
| Total | 74,475 | 50,000 | 24,475 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, appropriate for wind
Jurisdictional but reassessment timing unconfirmed
FPIC and grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →