Silvopastoral carbon project of Uruguay
#78of 94 in Soil carbon#7of 10 in Uruguay#755of 857 in Verra (VCS)#42of 53 in AR-ACM0003
Audit Analysis
This Uruguayan silvopastoral project (96.83 ha of Eucalyptus grandis) has VVB-confirmed additionality and a 10% buffer pool, but the verification report lists 15 corrective action requests and 12 clarification requests covering serious gaps in baseline evidence, permanence demonstration, and emission reproducibility. A stark discrepancy between the PDD's lifetime estimate (58,982 tCO₂e) and the validation report's figure (858 tCO₂e) raises significant over-crediting concerns, and the low extraction confidence across 15 documents limits assurance. The project is registered and operational, but the quality of its underlying evidence base is weak.
Red Flags
- The PDD (2023) claims a lifetime ERR of 58,982 tCO₂e while the validation report (2025) supports only 858 tCO₂e — a 98.5% reduction that suggests the original design was not well-grounded in field evidence
- The verification report lists 'Insufficient evidence supports the baseline and additionality demonstration' and 'Project emissions are not reproducible' among its material findings, despite all 15 CARs being closed
- Non-permanence risk is described as 'not addressed' in the verification report, and the NPR report was flagged as missing, leaving reversal risk inadequately quantified
- Low extraction confidence across the document set means key figures (ERR, baseline parameters) may not be reliably captured, reducing overall assurance
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 120 | 0 | 120 | |
| Total | 120 | 0 | 120 |
Risk Indicators
VVB-confirmed combined test
Buffer pool present but NPR missing
0% deduction, negligible justification
Project-specific, evidence gaps noted
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →