Skip to main content
UCRMaharashtra IndiaACM0002

Wind Bundle Project in Maharashtra by Sispara

UCR-553 ↗

#3of 13 in Maharashtra India#114of 421 in Universal Carbon Registry (UCR)#344of 383 in ACM0002

3.7/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
5.0
Documentation
2.5

Audit Analysis

A newly registered wind energy project (ACM0002) in Maharashtra with a jurisdictional baseline and no material findings, but the available record is extremely thin: only a PDD and one unidentified document were used, extraction confidence is low, and no VVB, additionality test, or ERR figures could be confirmed. The project type carries lower inherent risk than forestry, yet the absence of verifiable additionality evidence and any third-party verification leaves material uncertainty about claim robustness.

Red Flags

  • No additionality test type or VVB confirmation found in the extracted record — a core requirement for any carbon credit project is unverified
  • No VVB name identified; no verification or monitoring report present in the document set
  • Extraction confidence is low, meaning key fields may be missing due to document readability rather than genuine absence, but this cannot be resolved from the available data
  • No buffer pool or permanence mechanism stated for a project with a 6-year crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not stated in available documents

Permanence

No buffer pool or reversal data confirmed

Leakage

0% deemed negligible — consistent with wind

Baseline

Jurisdictional baseline, 2024 grid EF

Safeguards

Mentioned and benefit sharing described; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents