Avoidance of methane emission from Municipal Solid Waste project in Ethiopia
Developer: Anaka Management Services Private Limited
#516of 1697 in Industrial#20of 50 in Ethiopia#121of 164 in CerCarbono (CC)#10of 35 in ACM0022
Score from methodology v2.1 (analysis of 25 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 31,878 | 0 | 31,878 | |
| 2021 | 51,886 | 0 | 51,886 | |
| 2022 | 49,808 | 0 | 49,808 | |
| 2023 | 94,582 | 0 | 94,582 | |
| 2024 | 118,666 | 0 | 118,666 | |
| Total | 346,820 | 0 | 346,820 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2020–2024ACM0022 v3.0current version
monitoring report + issuance document
official page · verified on
- ACM0022: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
Marketplaces
Each listing shows what the shop published on the day it was checked. The registry balance on this page is not a seller's stock, and some shops show no price.
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Guangzhou Eastern Solid Resource Recycling Center MSW Integrated treatment Plant ProjectVCS-2746
- The project of Kitchen and catering waste Disposal Phase II in Wuchang areaVCS-4454
- IBB Waste Incineration and Power Generation Plant ProjectGS-1967
- Solid Waste to Energy Production Facility SonepatVCS-3544
- Soc Son Waste to Power Plant ProjectVCS-2567
- Integrated Solid Waste Management Project at Mathura, Uttar PradeshCDM-9272
- Yixian MSW Incineration and Power Generation ProjectVCS-5040
- Ödemis Integrated Solid Waste Management PlantVCS-3797
