Liaoning Faku Wanghaisi East Wind Power Project
Developer: Shenyang Longyuan Wind Power Co., Ltd
Methodology: ACM0002 (CDM)
#321of 4744 in Renewable energy#96of 2787 in China#295of 1615 in Verra (VCS)#293of 3246 in ACM0002
Score from methodology v2.1 (analysis of 3 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Oct 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 51,273 | 51,273 | 0 | |
| 2009 | 55,079 | 5,079 | 0 | |
| 2010 | 7,032 | 7,032 | 0 | |
| 2012 | 19,195 | 14,709 | 4,486 | |
| Total | 132,579 | 78,093 | 4,486 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2008–2010ACM0002 v7.0since replaced by v22.0
monitoring report
official page · verified on
2012–2017ACM0002 v7.0since replaced by v22.0
monitoring report + verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Retired by
- To offset the greenhouse gas emissions generated by the operations of Bank of China Limited Anhui Branch from January 1, 2024 to December 315,480 t
- The 4th (2025) Petroleum and Petrochemical Industry Exhibition and EPEC Industrial Products Exhibition from Sep 24 to Sep 261,510 t
- 2024 GHG Emission Offset for Jiangsu Hefeng Agricultural Development Co., Ltd1,508 t
- The estimated GHG emissions generated from the Keang Peng School(Primary and Kindergarten) from January 1, 2024 to December 311,500 t
- The Actual GHG emissions generated from the Keang Peng School(Primary and Kindergarten Division) from January 01, 2023 to December 311,487 t
- 2022 GHG Emission Removal for Shanghai Shidong High School1,278 t
- GHG emissions generated during business operations of CGS International Holdings Limited in 2022 and 2023720 t
- More than half of the GHG emissions generated from the 2nd China-Portuguese-Speaking Countries Economic and Trade Expo (Macao) on October 22 to 25251 t
- More than half of the GHG emissions generated from the 30th Macao International Trade & Investment Fair on October 22 to 25242 t
- Beijing Energy Holding Co., Ltd130 t
Organisations named as beneficiaries in the registry's public retirement records. (+18)
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and score.
- Liaoning Faku Wanghaisi East Wind Power ProjectClean Development Mechanism · CDM-1965
Similar projects
Same methodology or sector, the same registry first.
- Sanibey Dam And Hydroelectric Power PlantVCS-1100
- Wind Power Project at Rajkot, GujaratVCS-1045
- Manantiales Behr Wind FarmVCS-1820
- Wind Power Project at Bhachau by Powerica LimitedVCS-1209
- Parbati Hydroelectric Project Stage IIIVCS-1425
- Camlica-3 HPP, Run-of-River Hydro Project, TurkeyVCS-759
- 20 MWAC (22 MWDC) SKCIL SOLAR POWER PLANT PROJECTVCS-1854
- Inner Mongolia Bayannaoer Chuanjingsumu 49.3MW Wind Power ProjectVCS-396
