Skip to main content
Database · Buyer

Carbon credit buyers/

Norwegian Cruise Line Holdings Ltd

Named as beneficiary of 2,750,000 t CO₂e retired in 92 retirements from 15 projects · 2022-04 → 2024-01

Source: the public retirement records of VCS (beneficiary named by the registry). A retirement beneficiary is not necessarily the direct purchaser of the credits, and only retirements where the registry publishes the beneficiary are counted, so the total can be lower than what the organisation retired. The quality view below is CarbonMeld's assessment of each project — not a rating of the company. Something wrong? Tell us.

What these tonnes are

  • Projects currently rated 7+/100%
  • Projects currently rated below 5/100%
  • Projects without a current rating11%
  • Projects with a registry red flag (rejected, withdrawn…)0%
  • Projects carrying the registry's CCP label0%
  • Carbon removal projects0%
  • Projects carrying a CORSIA eligibility label0%

Shares weight each project by the tonnes this organisation retired from it: the denominator is all retired tonnes and the categories overlap — a project can carry several labels at once. They use today's registry labels and CarbonMeld assessments of the projects, not the vintage-specific certification of the retired units, and not those at the time of retirement. The unassessed share is not a quality verdict: it names projects without a current CarbonMeld assessment.

Projects retired

  1. 5.8/10
  2. Baesa ProjectVCS-10Brazil508,082 t
    5/10
  3. 6.5/10
  4. analysis queued
  5. Ceyhan 61.7 MW Hydropower ProjectVCS-810Türkiye130,427 t
    5.2/10
  6. score withdrawn
  7. 6/10
  8. analysis queued
  9. Toros Hydroelectric Power PlantVCS-1499Türkiye50,000 t
    5.2/10
  10. 5.4/10
  11. Dereli Hydroelectric Power PlantVCS-1758Türkiye50,000 t
    6/10
  12. 6.7/10
  13. 5.9/10
  14. Negros Island Solar Power Inc.VCS-1735Philippines900 t
    score withdrawn
  15. 4.8/10

Latest retirements

DateTonnesVintageProject
2024-01-08250,0002014The Hyundai Waste Energy Recovery Co-Generation Project Phase II
2024-01-08100,0002013Baesa Project
2024-01-0832,9462020Kumköy Hydroelectric Power Plant, Samsun
2024-01-0828,2512019Damlapinar Hydroelectric Power Plant Project
2024-01-0821,657201350 MW Sipansihaporas Hydro Power Plant, North Sumatra
2024-01-0820,0002011Ceyhan 61.7 MW Hydropower Project
2024-01-0817,2322020Kepezkaya Hydroelectric Power Plant Project
2024-01-0815,0002017Toros Hydroelectric Power Plant
2024-01-0810,000201550 MW Sipansihaporas Hydro Power Plant, North Sumatra
2024-01-0810,0002014Parbati Hydroelectric Project Stage III
2024-01-088,343201350 MW Sipansihaporas Hydro Power Plant, North Sumatra
2024-01-086,3522018Damlapinar Hydroelectric Power Plant Project
2024-01-085,0002018Toros Hydroelectric Power Plant
2024-01-083,1702021Kumköy Hydroelectric Power Plant, Samsun
2024-01-081562018Damlapinar Hydroelectric Power Plant Project
2024-01-081252018Negros Island Solar Power Inc.
2024-01-081252016Bundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-V2)
2024-01-08502017‘Guanaré’ Forest Plantations on Degraded Grasslands Under Extensive Grazing
2023-09-18100,0002013Baesa Project
2023-09-1825,5912020Damlapinar Hydroelectric Power Plant Project
2023-09-1825,0002020Kepezkaya Hydroelectric Power Plant Project
2023-09-189,1092020Kumköy Hydroelectric Power Plant, Samsun
2023-09-12200,0002014The Hyundai Waste Energy Recovery Co-Generation Project Phase II
2023-09-1240,000201350 MW Sipansihaporas Hydro Power Plant, North Sumatra
2023-09-1220,0002018Toros Hydroelectric Power Plant