Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Re-assessment pending

15 MW Solar Photovoltaic Power Plant in Gujarat

Standard
CDM
Methodology
AMS-I.D (CDM)
Registry
CDM-6231 ↗ · Registered
Country
India
Credit type
Solar
Vintage
2008, 2012, 2013

CarbonMeld's document-based rating gives 15 MW Solar Photovoltaic Power Plant in Gujarat (CDM-6231) 3.1 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 21 Oct 2026; a re-assessment is pending. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.

Assessment

Document-based rating

3.1/10

Very low rating (under 3.5)

How solid the credit is, as far as the registry's public documents show. Additionality and quantification start from a public grade; permanence starts at 5.0, the neutral point, where none applies, and claim safety always does.

This rating is provisional. A new analysis of the project is pending.

Methodology v3 · documents read on 21 Oct 2026

Not counted in the number: 1 item, named in the Premium analysis.

Analysis

15 MW Solar Photovoltaic Power Plant in Gujarat (India) generates grid-connected renewable electricity (solar PV, 15 MW) under AMS-I.D, Version 17; registry status Registered (CDM), 165,891 credits issued in 2015–2023. The documents name BUREAU VERITAS CERTIFICATION as validation / verification body. The documents estimate 22,576 tCO2e per year, 158,031 tCO2e over the 7-year crediting period. The latest monitoring report (2014-04-01 – 2019-06-30) reports 123,575 tCO2e achieved. The latest monitoring period achieved 104% of its ex-ante estimate (per the monitoring report).

Eligibility & market

Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

    Covers: the project type, not a label on individual credits

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Issuances

IssuedRetiredAvailable
Issued in 2015
42,372042,372
monitoring periods 1 Jul 2012 – 31 Mar 2014
Issued in 2023
123,5190123,519
monitoring period 1 Apr 2014 – 30 Jun 2019
Total165,8910165,891

The registry publishes each issuance with its monitoring period. Each row here is the sum of one year's issuances, by the year they were issued — not a vintage (the year the reductions or removals took place). Under each year: the monitoring periods of the credits issued in it.

Methodology versions used

The methodology versions this project used, with its monitoring periods and their transitions, are in the Premium analysis.

Where to buy

Got an offer for these credits? Check it against the registry →

Marketplaces

Each listing shows what the shop published on the day it was checked. The registry balance on this page is not a seller's stock, and some shops show no price.

+ Know where to buy this?

Listing multiple projects? Send us a CSV at listings@carbonmeld.com.

Profile & governance

Are you the project owner?

Full analysis (free for owners)

Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.

hello@carbonmeld.com →

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the rating.

hello@carbonmeld.com →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →

Cite this page

CarbonMeld (2026). 15 MW Solar Photovoltaic Power Plant in Gujarat (CDM-6231): CarbonMeld document-based rating, methodology v3, documents read on 21 Oct 2026. https://carbonmeld.com/projects/15-mw-solar-photovoltaic-power-plant-in-gujarat/.

The citation names the rating by its methodology version and the day the documents were read.

Unlock the full analysis

On this page: the analysis of 21 Oct 2026, marked “Re-assessment pending”. The evidence coverage, the starting points, the dimension values of the rating, every rule that raised or lowered the number with the fact and the source it rests on, the negative facts by name with their detail and quotes, what is not counted, the methodology history, the retirement beneficiaries, and the curated list of its 7 registry documents, with what we read in each.

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and the dimension values in side-by-side comparisons, when every rated project is on the same version of our methodology (public-data comparison is free; fair use: 30 projects per day, or 300 with Pro at €49 + VAT per month). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Enter your email to pay with crypto

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Similar projects

Same methodology or sector, the same registry first.