6 MW Wind Power Project in Tamil Nadu by REI Agro Limited
#414of 1935 in Renewable energy#214of 975 in India#264of 1459 in CDM (UNFCCC)#151of 806 in AMS-I.D
Audit Analysis
A standard 6 MW CDM wind project in Tamil Nadu with a VVB-verified investment-test additionality and a jurisdictional grid baseline. The validation stage surfaced 12 material findings (including an initially invalid benchmark and insufficient sensitivity analysis), all of which were corrected, but the initial PDD quality was notably weak. The first monitoring period delivered roughly 52% of the pro-rata ex-ante expectation, consistent with wind variability but suggesting the lifetime estimate may be somewhat optimistic.
Red Flags
- Twelve material findings (CARs) at validation, including an invalid initial benchmark (CERC) that had to be replaced with WACC, and insufficient investment-analysis sensitivity analysis
- First monitoring period (Dec 2010 – May 2012) verified reductions of 11,072 tCO₂e represent only ~52% of the pro-rata expectation (~21,464 tCO₂e) derived from the 156,100 tCO₂e lifetime estimate, raising questions about the ex-ante output assumption
- Grid emission factor appears in two different units across documents (0.0009293 tCO₂/kWh in the PDD vs 0.9293 tCO₂/MWh in the validation report), creating a presentation-level discrepancy that could confuse readers
- Crediting-period start date differs between the PDD (2010-09-01) and the monitoring report (2010-12-28), a ~3.5-month gap that is unexplained
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 11,048 | 0 | 11,048 | |
| Total | 11,048 | 0 | 11,048 |
Risk Indicators
VVB-verified but initially weak (invalid benchmark, 12 CARs)
Avoidance project, no reversal risk, no reversal events
0% deduction, justified as negligible for grid-connected win
Jurisdictional grid EF (2007), standard for CDM wind
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →