Skip to main content
CDMWindIndiaAMS-I.D

7.85 MW Bundled Wind Power Project in Southern India

CDM-1082 ↗

#102of 770 in Renewable energy#58of 387 in India#14of 213 in CDM (UNFCCC)#33of 417 in AMS-I.D

6.2/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
7.0

Audit Analysis

A 7.85 MW bundled wind project in Southern India registered under CDM with a VVB-verified combined additionality test and no inherent permanence risk. The project's integrity is moderated by a baseline-method contradiction between the validation report (jurisdictional) and the 2022 monitoring report (project-specific), and by six corrective action requests raised during validation (notably a non-conservative PLF assumption that was subsequently corrected). Documentation is reasonably complete with high extraction confidence, but verified ERR figures and several MRV parameters remain absent from the extracted record.

Red Flags

  • Baseline method is described as 'jurisdictional' in the 2007 validation report but 'project' in the 2022 monitoring report — an unexplained shift that could affect the validity of the emission-factor basis.
  • The validation process raised six corrective action requests, including a finding that the initial CER calculation used guaranteed (rather than actual) plant load factor, indicating the original credit estimate was not conservative.
  • Total verified ERR is not stated in any available document, preventing independent cross-check of claimed versus delivered credits.

Credit Vintages

IssuedRetiredAvailable
2011
16,494016,494
Total16,494016,494

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, quantified justification

Baseline

Method contradiction across documents

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents