Biogas Support Program – Nepal Activity-4

GS-2770 ↗ · current registry ID: GS10813

#60of 111 in Biogas#11of 14 in Nepal#317of 426 in Gold Standard (GS)#18of 26 in AMS-I.E

4.7/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A Gold Standard biogas project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by multiple material findings, a missing buffer pool, unresolved reversal-event documentation, and significant data inconsistencies across the verification, monitoring, and validation reports. The project's claims are moderately conservative (verified usage rate well below the assumed rate), yet the volume of corrective actions and the crediting-period contradiction raise meaningful reliability concerns.

Red Flags

  • Eight or more corrective actions and compliance-level findings were raised in the verification report, including missing double-counting declaration, missing OFN/ODA support documents, and incorrect labelling of leakage emissions as project emissions.
  • The fNRB value was held fixed for the entire crediting period, which the verification report flags as contrary to Gold Standard Tool 30 expiry rules.
  • Reversal events are marked as 'not addressed' in the verification report, and no buffer pool percentage is stated in any available document.
  • The crediting period differs between the verification report (Dec 2018 – Dec 2025) and the validation report (Dec 2023 – Dec 2028), creating ambiguity about which period the 2022 monitoring data belongs to.
  • A non-operational digester (BCE 00043) was observed due to sale of a buffalo, and the accounting treatment for such abandonment is not clarified in the ERR estimation.

Credit Vintages

IssuedRetiredAvailable
2018
4,87604,876
2019
66,723066,723
2020
64,448064,448
2021
62,74962,7490
2022
64,950064,950
Total263,74662,749200,997

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool; reversal not addressed

Leakage

5% quantified deduction

Baseline

Project-specific; reassessed 2025

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.E.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents