Audit Analysis
A Gold Standard wind energy project in Karnataka, India, with a jurisdictional baseline and investment-test additionality, but severely undermined by a 97% reduction in verified credits relative to the monitoring report's claim (1,868 vs 60,924 tCO₂) and twelve material findings including the project being misidentified as solar and located in the wrong state. The VVB (Applus+) caught these errors, but the magnitude of the discrepancy and the quality of the underlying monitoring data raise significant concerns about the reliability of the project's emissions accounting.
Red Flags
- Verified credits (1,868 tCO₂) are only 3.1% of the monitoring report's claimed figure (60,924 tCO₂) for the same period, indicating a 97% reduction by the VVB
- The monitoring report incorrectly described the project as a solar power plant and stated the wrong state (Telangana instead of Karnataka)
- Twelve material findings were raised in the verification report, including incorrect meter readings for three meters (BVP-03, BVP-08, BVP-11) and missing calibration certificates
- FPIC was not conducted despite the project's community-facing nature in rural Karnataka
- Leakage justification is contradictory across documents: 'quantified' in the 2022 verification report versus 'deemed negligible' in the 2013 verification report
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test present; VVB confirmation not explicitly stated
Wind avoidance project; no reversal risk
0% deduction; justification inconsistent across reports
Jurisdictional baseline; last reassessment not stated
Grievance mechanism and benefit sharing present; FPIC not conducted
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →