Skip to main content
ICRSequestration / RemovalISGeneral Methodologyv2.0

Fjallssel

ICR-328 ↗

#25of 38 in ARR (afforestation)#3of 12 in IS#18of 32 in Intl. Carbon Registry (ICR)

1.8/ 10
Integrity
1.5
Transparency
1.0
Claim Safety
2.5
Documentation
2.5

Audit Analysis

The Fjallssel forest carbon project in Iceland is registered under the Icelandic Forest Carbon Code with iCert as the verification body, but the available record consists solely of a project design document with no monitoring reports, verification reports, or quantified baseline methodology. Critical integrity elements — additionality testing, baseline method, permanence mechanisms, and leakage treatment — are entirely absent from the extracted data, making it impossible to confirm the robustness of the 16,813 claimed removal units.

Red Flags

  • No additionality test type or VVB confirmation found in the available PDD; for a sequestration project this is a fundamental gap
  • No baseline methodology or reassessment date stated; the 16,813 claimed ERR cannot be traced to a defined counterfactual
  • Permanence risk for a sequestration project is addressed only by a general statement about regeneration; no buffer pool, no quantified reversal mechanism, and no monitoring data to confirm carbon stocks are stable
  • Leakage is entirely unaddressed in the available documents despite being a standard requirement for forest projects
  • No monitoring reports or verification reports are available; the 16,813 claimed ERR has no verified counterpart
  • Leakage not addressed in project documentation
  • Buffer pool size not disclosed in available documents

Credit Vintages

IssuedRetiredAvailable
2029
1270127
2030
1370137
2031
1500150
2032
1640164
2033
1790179
2034
1970197
2035
2160216
2036
2380238
2037
2610261
2038
2870287
2039
3140314
2040
3430343
2041
3740374
2042
4060406
2043
4380438
2044
4700470
2045
5010501
2046
5300530
2047
5570557
2048
5820582
2049
6010601
2050
6170617
2051
6270627
2052
6330633
2053
6320632
2054
6250625
2055
6120612
2056
5920592
2057
5670567
2058
5370537
2059
5040504
2060
4680468
2061
4310431
2062
3940394
2063
3580358
2064
3240324
2065
2920292
2066
2640264
2067
2380238
2068
2150215
2069
1940194
2070
1770177
2071
1600160
2072
1470147
2073
1340134
Total16,814016,814

Risk Indicators

Additionality

No additionality test found in available documents

Permanence

General regeneration statement only; no buffer pool or quant

Leakage

Not addressed in available documents

Baseline

No baseline method or reassessment date stated

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated; dual-channel risk unassess

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-18General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents