*Mare Manastir Wind Farm, Turkey

GS-657 ↗ · current registry ID: GS368

#13of 770 in Renewable energy#2of 121 in Turkey#3of 426 in Gold Standard (GS)#10of 383 in ACM0002

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

The Mare Manastir Wind Farm is a Gold Standard wind project in Turkey with a VVB-confirmed combined additionality test, a recently reassessed (2023) project-specific baseline, and matching claimed/verified ERR figures of 111,875 tCO2e for the 2023–2024 monitoring period. However, 13 corrective action requests during verification reveal initial gaps in monitoring data quality, and several key fields (buffer pool, CORSIA eligibility, CCP status, FNRB) are not stated in the available documents. The project is a solid avoidance-type renewable energy credit with moderate documentation concerns.

Red Flags

  • 13 Corrective Action Requests were issued during the 2025 verification, including omitted monthly generation data, missing meter accuracy classes, and incorrect training records — indicating initial monitoring-reporting quality gaps
  • Baseline method is recorded as 'project' in the 2025 verification report but 'jurisdictional' in the 2012 verification report, creating ambiguity about the baseline construction approach
  • FPIC was not conducted, and no buffer pool percentage is stated in any available document
  • CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2007
75,09672,7622,334
2008
84,44184,4410
2009
83,99283,9920
2010
83,99283,9920
2011
87,10487,1040
2012
81,66481,6640
2022
31,226031,226
2023
62,750062,750
2024
73,982073,982
Total664,247493,955170,292

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project; no buffer pool stated; reversal not addre

Leakage

0% deemed negligible, consistent with wind

Baseline

Project-specific; method contradiction across docs; reassess

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents