REDD+ THE LAST HABITAT
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which is stronger than an unverified claim.
missing Reversal events were reported, and the project relies on a 14% buffer contribution rather than a reversal-free record.
Transparency
missing The monitoring period is stated, but the record does not provide verified issuance totals or usage monitoring details.
missing Verra said the documentation was incomplete and that the VVB had not fully described its assessment of VCS conformance.
Claim Safety
verified Leakage was treated with a quantified deduction of 0%, which is better than no treatment at all.
missing The baseline is project-specific rather than jurisdictional, and the record contains contradictions on leakage and CCP status.
Documentation
verified Multiple official documents were used, including a stakeholder consultation record dated 2024-10-11 and a named VVB.
missing Verra explicitly stated the project documentation is incomplete, and the extraction confidence is only medium.
Detailed Analysis
Integrity
The project has some integrity support because the VVB confirmed additionality through an investment test, and the baseline was last reassessed in 2021. However, reversal events are reported in the extracted record, including deforestation, usurpation, and armed intrusion, which raises permanence concerns even with a 14% buffer contribution. Leakage is treated with a quantified 0% deduction, but the contradiction showing an alternative record that said leakage was not addressed reduces confidence in the treatment.
Transparency
Transparency is weak because the record does not state verified issuance totals, and usage monitoring details are not found in the available documents. The monitoring period is identified, but the project documentation was also found by Verra to be incomplete, and the VVB was said not to have fully described its assessment of VCS conformance. The extraction confidence is medium rather than high, which further limits trust in the completeness of the public record.
Claim Safety
Claim safety is limited by the project-specific baseline and the absence of clear verified usage data. The quantified leakage deduction of 0% helps, but the contradiction indicating leakage may have been not addressed in another document weakens confidence. The record also does not clearly state CORSIA eligibility, while a contradiction suggests CCP approval may have been claimed elsewhere, so dual-claim risk cannot be ruled out cleanly.
Documentation
Documentation quality is poor to moderate: there is a named VVB, a stated monitoring period, and several official findings, but Verra explicitly said the documentation is incomplete and non-conforming. The record also includes multiple unresolved corrective actions, and the evidence list is sparse. Because one key document was only extracted with medium confidence, the documentation score is further constrained.
Overall
I privileged the most recent stakeholder consultation record dated 2024-10-11 for the current status, while using the earlier project documents only where they were not contradicted. The contradictions matter: I treated the 14% buffer as the current value because it appears in the extracted record, but noted that an earlier document reportedly showed 10%; I also treated leakage as quantified because that is the current extracted value, while flagging the conflicting earlier 'not addressed' entry; and I treated CCP status as not mentioned because that is the current record, despite an older contradiction suggesting approval. Verra's finding that the documentation is incomplete and that the project does not conform with program rules is the dominant reliability signal and justifies downward pressure on transparency, documentation, and overall confidence.
Audit Analysis
This project has some positive elements, including a VVB-confirmed investment test, a quantified leakage deduction of 0%, and a 14% buffer contribution. However, the record also shows reported reversal events, a project-specific baseline, and major documentation problems flagged by Verra, which materially weaken confidence in the crediting claims.
Project Description
REDD+ EL ÚLTIMO HÁBITAT protege +14,000 hectáreas bosques amazónicos megadiversos ubicado en la propiedad de Bosques Amazónicos (BAM) en Ucayali, Perú. Este proyecto, único en el mundo, asemeja una "isla verde" de biodiversidad , protegiendo el último bloque continuo de bosque amazónico en la zona , clave para la conservación de especies tan importantes como el jaguar , el tapir, el oso hormiguero gigante y otras de alto valor ecológico, a tan solo 45 minutos de la ciudad de Pucallpa! CIFRAS DE IMPACTO: +14,000 hectáreas protegidas +3,000 hectáreas de aguajales (ecosistemas con mayor capacidad de secuestro de carbono) +835 familias indirectamente beneficiadas (comunidades aledañas al proyecto) +750 especies de flora y fauna protegidas +6 especies en peligro de extinción protegidas 80% de aves de toda la región de Ucayali protegidas en los bosques del proyecto
Red Flags
- Reported reversal and land-use conflict events in the project area, including deforestation, usurpation, and armed intrusion.
- Verra found the project documentation incomplete and identified multiple unresolved CCB/VCS compliance issues.
- Contradictions in the extracted record affect buffer size, leakage treatment, FPIC, and CCP status.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2025 (non verificato).
Risk Indicators
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →