The Envira Amazonia Project - A Tropical Forest Conservation Project In Acre, Brazil
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a common-practice test rather than leaving additionality entirely unsubstantiated.
missing The verification material reports that the baseline is not plausible, and leakage justification is not addressed.
Transparency
verified The project has a named VVB, a stated monitoring period from 2023 to 2025, and a large set of extracted documents.
missing The record has low extraction confidence, missing monitoring details, and conflicting emissions figures across documents.
Claim Safety
verified The project is not CORSIA-eligible, which reduces one channel of claim overlap risk.
missing The baseline is challenged in the verification material, leakage is not properly justified, and the verified emissions reduction figure is lower than the claimed amount.
Documentation
verified FPIC, safeguards, grievance mechanism, and benefit-sharing are described in the newer project documentation.
missing At least one key document was poorly readable, and the file set contains contradictions on additionality, safeguards, and emissions totals.
Detailed Analysis
Integrity
The project has a positive additionality signal because the VVB, AENOR, confirmed additionality, and the project uses a common-practice test. But the verification material also says the baseline is not plausible, and it flags missing suppression permits and missing EIA/RIMA evidence, which materially weakens baseline robustness. Leakage is a major weakness because the record gives a leakage deduction of 0% while the justification is not addressed.
Transparency
Transparency is mixed: the project has a named verifier, a defined monitoring period, and a large number of extracted documents. However, the extraction confidence is low, and the record lacks key monitoring details such as the usage monitoring method. The emissions reduction totals also conflict across documents, which reduces confidence in the public record.
Claim Safety
Claim safety is weakened by the challenged baseline and the absence of a credible leakage treatment. The project is not CORSIA-eligible, which helps, but the record still shows a large gap between claimed and verified emissions reductions, and the verification material raises concerns about the plausibility of the baseline. These issues increase over-crediting and greenwashing risk.
Documentation
Documentation quality is only moderate because the file set is broad and includes safeguards, FPIC, grievance, and benefit-sharing information. Still, the extraction confidence is low, and the contradictions show that different documents disagree on additionality test type, safeguards, buffer pool size, reversal status, and emissions totals. I privileged the newer and more specific verification-era information where available, but the contradictions themselves lower reliability.
Overall
I privileged the more recent and more specific verification-era material for items like benefit-sharing, safeguards, and the higher verified emissions reduction figure, because it appears to reflect later project documentation. Even so, the contradictions are material: emissions reductions differ substantially between documents, additionality test type is inconsistent, and leakage treatment shifts from quantified to not addressed. Given the challenged baseline, missing leakage justification, and low extraction confidence, the project’s overall quality is only moderate.
Audit Analysis
This project has some positive signals, including VVB-confirmed additionality, a sizable buffer pool, and a documented FPIC process and grievance mechanism. However, the baseline credibility is questioned by material findings, leakage is not properly justified, and the record contains multiple contradictions that reduce confidence in the claimed emission reductions.
Project Description
The Envira Amazonia Project in Brazil aimed to protect up to 200,000 hectares of tropical rainforest and preserve rich biodiversity and ecosystem services. It also provided direct benefits to local communities while mitigating the release of ~12.6 million metric tonnes of carbon dioxide emissions over the first 10 years of the Project.
Red Flags
- The verification material says the baseline is not plausible and notes missing suppression permits and EIA/RIMA evidence.
- Leakage is not addressed despite a REDD project type, and the claimed emissions reductions differ materially across documents.
- Leakage not addressed in project documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 152,031 | 151,981 | 50 | |
| 2014 | 844,390 | 634,253 | 210,137 | |
| 2015 | 1,368,582 | 1,233,304 | 135,278 | |
| 2016 | 1,911,446 | 1,445,536 | 465,910 | |
| 2017 | 2,477,578 | 1,861,537 | 616,041 | |
| 2018 | 287,794 | 284,678 | 3,116 | |
| 2019 | 500,204 | 430,971 | 69,233 | |
| 2020 | 383,834 | 359,696 | 24,138 | |
| 2021 | 355,936 | 355,697 | 239 | |
| Total | 8,281,795 | 6,757,653 | 1,524,142 |
Cosa migliorerebbe questo punteggio
- Provide a clear, document-backed leakage assessment and explain why a 0% deduction is appropriate for this REDD project.
- Resolve the baseline and emissions-reduction contradictions with a reconciled, version-controlled document trail and clearer public monitoring records.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradictory test record
Buffer pool present, reversal status unclear
Leakage not adequately addressed
Baseline plausibility challenged
Safeguards and FPIC described, but not fully validated
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
- Envira Amazonia Project Summary Document, Portuguese (2-16-26).pdf
- Envira_Amazonia_Project_Summary_Document,_Portuguese_(8-24-17).pdf
- 2015_EnviraMonitoring_2017.08.24.pdf
- 2014_EnviraMonitoring_2016.02.12.pdf
- Envira Amazonia Project's CCB VCS 2022 Monitoring Report 2024.1.23.pdf
- MONIT_REP_1382_01JAN2015_31DEC2015.pdf
- +12 more
Other
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →