Vai al contenuto principale
VCS Forestry Brazil Registry: Verification approval requested Documentazione completa General Methodology v2.0

The Envira Amazonia Project - A Tropical Forest Conservation Project In Acre, Brazil

VCS-1382 ↗

3.7 / 10
Integrity
2.9
Transparency
4.8
Claim Safety
3.9
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a common-practice test rather than leaving additionality entirely unsubstantiated.

missing The verification material reports that the baseline is not plausible, and leakage justification is not addressed.

Transparency

verified The project has a named VVB, a stated monitoring period from 2023 to 2025, and a large set of extracted documents.

missing The record has low extraction confidence, missing monitoring details, and conflicting emissions figures across documents.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of claim overlap risk.

missing The baseline is challenged in the verification material, leakage is not properly justified, and the verified emissions reduction figure is lower than the claimed amount.

Documentation

verified FPIC, safeguards, grievance mechanism, and benefit-sharing are described in the newer project documentation.

missing At least one key document was poorly readable, and the file set contains contradictions on additionality, safeguards, and emissions totals.

Detailed Analysis

Integrity

The project has a positive additionality signal because the VVB, AENOR, confirmed additionality, and the project uses a common-practice test. But the verification material also says the baseline is not plausible, and it flags missing suppression permits and missing EIA/RIMA evidence, which materially weakens baseline robustness. Leakage is a major weakness because the record gives a leakage deduction of 0% while the justification is not addressed.

Transparency

Transparency is mixed: the project has a named verifier, a defined monitoring period, and a large number of extracted documents. However, the extraction confidence is low, and the record lacks key monitoring details such as the usage monitoring method. The emissions reduction totals also conflict across documents, which reduces confidence in the public record.

Claim Safety

Claim safety is weakened by the challenged baseline and the absence of a credible leakage treatment. The project is not CORSIA-eligible, which helps, but the record still shows a large gap between claimed and verified emissions reductions, and the verification material raises concerns about the plausibility of the baseline. These issues increase over-crediting and greenwashing risk.

Documentation

Documentation quality is only moderate because the file set is broad and includes safeguards, FPIC, grievance, and benefit-sharing information. Still, the extraction confidence is low, and the contradictions show that different documents disagree on additionality test type, safeguards, buffer pool size, reversal status, and emissions totals. I privileged the newer and more specific verification-era information where available, but the contradictions themselves lower reliability.

Overall

I privileged the more recent and more specific verification-era material for items like benefit-sharing, safeguards, and the higher verified emissions reduction figure, because it appears to reflect later project documentation. Even so, the contradictions are material: emissions reductions differ substantially between documents, additionality test type is inconsistent, and leakage treatment shifts from quantified to not addressed. Given the challenged baseline, missing leakage justification, and low extraction confidence, the project’s overall quality is only moderate.

Audit Analysis

This project has some positive signals, including VVB-confirmed additionality, a sizable buffer pool, and a documented FPIC process and grievance mechanism. However, the baseline credibility is questioned by material findings, leakage is not properly justified, and the record contains multiple contradictions that reduce confidence in the claimed emission reductions.

Project Description

The Envira Amazonia Project in Brazil aimed to protect up to 200,000 hectares of tropical rainforest and preserve rich biodiversity and ecosystem services. It also provided direct benefits to local communities while mitigating the release of ~12.6 million metric tonnes of carbon dioxide emissions over the first 10 years of the Project.

Red Flags

  • The verification material says the baseline is not plausible and notes missing suppression permits and EIA/RIMA evidence.
  • Leakage is not addressed despite a REDD project type, and the claimed emissions reductions differ materially across documents.
  • Leakage not addressed in project documentation

Credit Vintages

Issued Retired Available
2012
152,031 151,981 50
2014
844,390 634,253 210,137
2015
1,368,582 1,233,304 135,278
2016
1,911,446 1,445,536 465,910
2017
2,477,578 1,861,537 616,041
2018
287,794 284,678 3,116
2019
500,204 430,971 69,233
2020
383,834 359,696 24,138
2021
355,936 355,697 239
Total 8,281,795 6,757,653 1,524,142

Cosa migliorerebbe questo punteggio

  • Provide a clear, document-backed leakage assessment and explain why a 0% deduction is appropriate for this REDD project.
  • Resolve the baseline and emissions-reduction contradictions with a reconciled, version-controlled document trail and clearer public monitoring records.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but contradictory test record

Permanence

Buffer pool present, reversal status unclear

Leakage

Leakage not adequately addressed

Baseline

Baseline plausibility challenged

Safeguards

Safeguards and FPIC described, but not fully validated

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti