Vai al contenuto principale
PUR Construction France Documentazione completa General Methodology v2.0

SAS OUATTITUDE

PUR-432365 ↗

4.5 / 10
Integrity
4.2
Transparency
4.8
Claim Safety
4.0
Documentation
5.6

Score Breakdown

Integrity

verified The verification report (2022) reports no material findings and no corrective actions required

missing Additionality, baseline, leakage, and reversal information were not found in the extracted record, limiting confidence in credit integrity

Transparency

verified The monitoring period is clearly stated (2021-12-01 to 2022-01-31) in the verification report (2022)

missing Claimed vs verified removals were not found in the extracted record, limiting MRV transparency

Claim Safety

verified A buffer pool contribution of 10% is stated, which can reduce non-permanence risk if properly governed

missing CORSIA eligibility and CCP status were not stated, and core over-crediting controls (baseline/leakage/additionality) were not found in the extracted record

Documentation

verified Independent VVB identified (DNV – Business Assurance Finland Oy Ab) and extraction confidence is high

missing Only one document was available/used and the evidence document is not clearly identified (listed as "unknown")

Detailed Analysis

Integrity

The verification report (2022) indicates no material findings and no corrective actions required, which is a positive signal for process quality. However, the extracted record does not include the additionality test used, whether additionality was explicitly confirmed by the VVB, the baseline method, or any leakage treatment, all of which are central to assessing over-crediting risk. A 10% buffer pool contribution is stated, but reversal events and their management were not found in the extracted record, limiting permanence assessment.

Transparency

The verification report (2022) clearly states the monitoring period (2021-12-01 to 2022-01-31) and identifies the VVB (DNV). However, the extracted record does not provide the claimed versus verified total removals, nor key MRV parameters (such as any usage monitoring method or fossil reference baseline approach), reducing transparency for independent review.

Claim Safety

Because the baseline method, leakage deduction/justification, and additionality approach were not found in the extracted record, there is elevated risk that credits could be perceived as overstated or hard to substantiate in public claims. The buffer pool contribution of 10% provides some risk mitigation for permanence, but without reversal reporting details it is difficult to judge adequacy. CORSIA eligibility and CCP status were not stated, so buyers should avoid implying alignment with those frameworks without further evidence.

Documentation

Documentation quality is moderate: the VVB is named and the extraction confidence is high, and the verification report is dated 2022-05-01. At the same time, only one document was used and the evidence document is labeled "unknown", suggesting the underlying documentation set is incomplete or not well-referenced in the extracted record. The absence of key quantified fields (claimed/verified removals, baseline, leakage) further indicates documentation gaps.

Overall

No contradictions were identified in the extracted record, so there is no need to privilege one document value over another. The main limitation is missing core integrity and MRV information (additionality, baseline, leakage, and claimed/verified totals), which materially reduces confidence in both credit quality and safe marketing claims. Note: if documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, the overall score would be capped at 6.0 (applied after scoring).

Audit Analysis

The project has third-party verification by DNV and reports no material findings or corrective actions, which supports basic credibility. However, key integrity-critical elements (additionality approach, baseline method, leakage treatment, and reversal history) were not found in the extracted record, increasing over-crediting and claim risk.

Red Flags

  • Additionality test type and whether the VVB confirmed additionality were not found in the extracted record
  • Baseline method and any baseline reassessment timing were not found in the extracted record
  • Leakage deduction and justification were not found in the extracted record
  • CORSIA and CCP status were not stated, creating uncertainty for downstream claims and labeling

Credit Vintages Exhausted

Issued Retired Available
2022
12,250 12,250 0
Total 12,250 12,250 0

Cosa migliorerebbe questo punteggio

  • Publish or provide the PDD/monitoring report sections that specify the additionality test, baseline method (and any reassessment), and leakage assessment (including any deduction and justification).
  • Disclose the claimed and verified total removals for the monitoring period, plus key MRV parameters (e.g., usage monitoring method and any fossil reference baseline approach) and clarify CCP/CORSIA status for claim-making.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Additionality assessment not found

Permanence

10% buffer stated; reversals not evidenced

Leakage

Leakage treatment not found

Baseline

Baseline method not found

Safeguards

Safeguards/FPIC/grievance not found

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti