Skip to main content
PUREnhanced Rock Weathering, 2022United StatesGeneral Methodologyv2.0

Lithos Carbon US Southeast ERW Deployment

PUR-203380 ↗

#7of 9 in DAC#55of 115 in United States#96of 109 in Puro.earth (PUR)

3.8/ 10
Integrity
3.5
Transparency
4.0
Claim Safety
3.0
Documentation
5.5

Audit Analysis

The Lithos Carbon US Southeast ERW project has a VVB-confirmed investment additionality test but suffers from fundamental model deficiencies (missing secondary dissolution effects, pH-dependent weathering rates, and field performance expectations) that the project explicitly states it is unable to correct, resulting in a qualified positive opinion. The verified ERR figure equals the full lifetime claim for a single-year monitoring period, raising serious over-crediting concerns, while safeguards, permanence mechanisms, and leakage justification are largely absent.

Red Flags

  • The verification report records multiple material findings that the ERW model omits secondary dissolution effects (fluid supersaturation, clay formation, surface passivation), pH-dependent weathering rates, and field performance expectations — and Lithos explicitly stated it is unable to make the necessary corrections, with the issue closed only via a qualified positive opinion.
  • The verified ERR of 2,361.71 tCO2e for a single 1-year monitoring period equals the full 5-year lifetime claim, representing 500% of the pro-rata expectation (472.3 tCO2e), a ratio that strongly suggests over-crediting or a misalignment between the claimed and verified bases.
  • No buffer pool, no explicit permanence mechanism, and reversal events are marked as not addressed, despite 654.65 tCO2e of quantified carbon storage losses from riverine and marine pathways.
  • Safeguards are effectively absent: the verification report confirms no FPIC, no grievance mechanism, and no documented safeguards, contradicting the validation report and PDD which claimed these were present.
  • Leakage deduction is 0% with the justification recorded as 'not addressed' in the verification report, despite the PDD claiming it was 'deemed negligible'.

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
3,0133,0130
Total3,0133,0130

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool; reversal risk unaddressed

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; no reassessment date

Safeguards

No FPIC, grievance, or safeguards confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents