PUREnhanced Rock Weathering, 2022United StatesGeneral Methodologyv2.0

Eion - Twinterstellar 3021

PUR-387867 ↗

#1of 9 in DAC#16of 115 in United States#26of 109 in Puro.earth (PUR)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

Twinterstellar 3021 is an Enhanced Rock Weathering DAC project with strong inherent permanence (ocean bicarbonate durability >1,000 years) and VVB-confirmed additionality, but the verification report surfaced six material findings—including a non-robust flux method, an ERA completed after application, and 18 of 122 fields flagged as outliers—indicating meaningful methodological and operational gaps. The project delivered only ~19% of its pro-rata PDD expectation for the elapsed monitoring period, which is conservative but raises questions about the original estimate's accuracy.

Red Flags

  • The flux method for background weathering was found not to be scientifically robust by the VVB; the project switched to the soil method after the fact, and the PDD's counterfactual weathering figure still needs updating.
  • The Environmental Risk Assessment was not completed prior to rock application; Puro.earth granted an exception, and the initial ERA review did not consider radionuclide or asbestos risks.
  • 18 of 122 monitored fields (~15%) were identified as outliers for soil clay content, and aqua regia digestions were found to underreport chromium concentrations, raising data-quality concerns across the monitoring dataset.
  • The PDD estimates a lifetime removal of 12,285 tCO₂e, yet only 748.31 tCO₂e was verified over the first ~1.6-year monitoring period—roughly 19% of the pro-rata expectation—suggesting the original estimate may have been overly optimistic.

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
7487480
Total7487480

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Strong inherent durability, no buffer pool stated

Leakage

0% deemed negligible, minimal justification

Baseline

Project-specific, no reassessment date stated

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents