Lithos Mid-West Facility
#5of 9 in DAC#45of 115 in United States#71of 109 in Puro.earth (PUR)
Audit Analysis
The Lithos Mid-West ERW project has a VVB-confirmed additionality test and a named verification body, but the validation report identifies seven material findings, most critically that the dissolution model omits secondary effects (supersaturation, clay formation, passivation) and pH-dependent weathering rates required by the methodology. No buffer pool, grievance mechanism, or FPIC process is documented, and the 0% leakage deduction rests on a thin 'deemed negligible' justification. The project is in its first monitoring period with corrective actions still open, so the credit base is not yet fully robust.
Red Flags
- ERW dissolution model missing secondary effects (supersaturation, clay formation, surface passivation) contrary to Methodology Section 8.1 — carbon removal estimates may be overestimated
- Weather rates affected by pH not fully modeled, a further gap in the dissolution physics
- No buffer pool or permanence mechanism documented for a 5-year crediting period
- No grievance mechanism and no FPIC process; stakeholder engagement gaps (missing mailing address, no anonymous feedback channel) flagged as material findings
- Total ERR claimed figure not found in any available document, preventing a pro-rata delivery check against the 2,362.92 tCO₂ verified for the first monitoring period
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 2,362 | 2,362 | 0 | |
| Total | 2,362 | 2,362 | 0 |
Risk Indicators
VVB-confirmed investment test
No buffer pool or permanence mechanism documented
0% deduction, 'deemed negligible' only
Project-specific, no reassessment date stated
Safeguards mentioned but no grievance mechanism or FPIC
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →