Lithos Mid-Atlantic Facility
#3of 9 in DAC#34of 115 in United States#53of 109 in Puro.earth (PUR)
Audit Analysis
The Lithos Mid-Atlantic Facility is a new Enhanced Rock Weathering project at the validation stage with a confirmed investment additionality test, but the underlying removals model has significant scientific gaps (missing secondary effects and pH-dependent weathering rates) that raise serious over-crediting concerns. The absence of a buffer pool, an unaddressed leakage justification, and a project-specific baseline further weaken the integrity profile. Corrective actions are required before the next verification cycle, and the project should not be considered credit-ready until the model deficiencies are resolved.
Red Flags
- The ERW model omits secondary effects on dissolution (supersaturation, clay formation, passivation) and pH-dependent weathering rates, as flagged in the validation report — a fundamental scientific gap that could materially overstate removals
- Leakage deduction is 0% with the justification recorded as 'not addressed' in the validation report, contradicting the PDD's claim that leakage was 'deemed negligible'
- No buffer pool is in place for a project type where mineral-form carbon storage, while more stable than biogenic carbon, still carries some reversal risk
- Six corrective actions are required, including a model upgrade to incorporate secondary effects and environmental factors per Methodology Section 8.1, before the next verification
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 2,146 | 2,146 | 0 | |
| Total | 2,146 | 2,146 | 0 |
Risk Indicators
VVB-confirmed investment test
No buffer pool; ERW reversal risk unquantified
0% deduction, justification not addressed in VVB report
Project-specific baseline, no reassessment date
Safeguards mentioned but grievance mechanism and FPIC gaps c
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →