10 MW Biomass based power generation project by Rake Power Limited at Ramtek, Nagpur

CDM-4319 ↗

#1of 352 in Biomass#43of 975 in India#45of 1459 in CDM (UNFCCC)#27of 806 in AMS-I.D

6.7/ 10
Integrity
7.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

A 10 MW biomass power project in Nagpur, India, with a well-supported combined additionality test confirmed by DNV and a conservative jurisdictional grid emission factor. The first monitoring period shows verified emissions reductions at 97% of the pro-rata expectation, with no material findings or corrective actions. Key gaps remain in FNRB methodology, usage-rate monitoring details, and the absence of a verification report in the extracted record.

Red Flags

  • No verification report found in the extracted document set — only a validation report and one monitoring report are present, leaving the full crediting-period verification chain incomplete.
  • FNRB value and method are not stated in any available document, creating an unquantified uncertainty in the net emissions reduction calculation.
  • Leakage justification is inconsistent across documents: the validation report describes it as 'deemed negligible' while the monitoring report labels it 'quantified,' yet the deduction is 0% in both cases.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test; IRR below benchmark

Permanence

Avoidance project; no reversal events

Leakage

0% deduction; 73% surplus justification; label inconsistency

Baseline

Jurisdictional NEWNE grid; conservative EF

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents