Skip to main content
CDMBiomass EnergyIndiaGeneral Methodologyv2.0

6.0 MW Biomass based cogeneration power plant of Rama Paper Mills Limited, Kiratpur, Uttar Pradesh.

CDM-1181 ↗

#26of 196 in Biomass#134of 387 in India#45of 213 in CDM (UNFCCC)

5.6/ 10
Integrity
5.8
Transparency
5.2
Claim Safety
5.3
Documentation
6.2

Audit Analysis

A 6 MW biomass cogeneration project in India with VVB-confirmed additionality and a quantified leakage treatment, but significant gaps in feedstock sustainability, permanence safeguards, and verified emissions data. Multiple contradictions between the PDD, validation reports, and monitoring reports—particularly on baseline methodology and leakage treatment—reduce confidence in the credit's robustness. The project lacks FPIC, a grievance mechanism, and any documented safeguards framework.

Red Flags

  • Baseline methodology is contradictory: the PDD (2007) describes a jurisdictional baseline while the 2012 monitoring report references a project-specific baseline, creating uncertainty about which baseline was actually applied.
  • No feedstock sustainability assessment, carbon content testing, or storage verification data found in any available document for a biomass project.
  • No FPIC, grievance mechanism, or safeguards documentation despite the project operating in a rural Indian community.
  • Grid emission factor is from 2005 and no updated value is provided in the 2012 monitoring report.
  • Crediting period end date is missing from the 2012 monitoring report, making the full project lifetime and pro-rata credit calculation impossible to verify.

Credit Vintages

IssuedRetiredAvailable
2010
20,649020,649
2011
34,483034,483
2012
28,484028,484
Total83,616083,616

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool or reversal tracking

Leakage

Quantified but no specific value stated

Baseline

Method contradiction; 2005 grid EF

Safeguards

No FPIC, grievance, or safeguards

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents