Skip to main content
CDMWindIndiaAMS-I.D

6.25 MW wind power project by VELATAL SPINNING MILLS PVT LTD

CDM-5213 ↗

#1151of 1935 in Renewable energy#596of 975 in India#872of 1459 in CDM (UNFCCC)#373of 806 in AMS-I.D

4.9/ 10
Integrity
6.3
Transparency
3.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 6.25 MW CDM wind project in India with a solid investment-test additionality assessment confirmed by Bureau Veritas and a standard jurisdictional grid baseline. However, the available record contains no monitoring or verification data, the extraction confidence is low, and the validation report logged 21 material findings (all subsequently resolved), limiting confidence in the project's ongoing performance and data reliability.

Red Flags

  • No monitoring or verification reports are present in the extracted record; total verified ERR is not available, so actual delivery cannot be assessed against the 124,760 tCO2e lifetime claim.
  • The validation report lists 21 material findings covering IRR calculations, PDD section errors, stakeholder meeting documentation, and data-source gaps — all resolved, but the volume suggests a weak initial submission.
  • Extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the structured data.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

Avoidance project; no reversal data

Leakage

0% deduction; PDD vs VR contradiction

Baseline

Jurisdictional grid EF, AMS-I.D

Safeguards

Mentioned; no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents