8.5 MW Wind Energy Project by KS Oils Limited, India
#415of 1935 in Renewable energy#215of 975 in India#265of 1459 in CDM (UNFCCC)#152of 806 in AMS-I.D
Audit Analysis
A standard 8.5 MW onshore wind project in India using the well-established AMS I.D. methodology, with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project is fundamentally low-risk in terms of additionality and permanence, but the verification process surfaced 15 material findings and two corrective actions, and several key monitoring parameters remain unreported. Pro-rata delivery for the first monitoring period was approximately 73% of expectation, within normal wind-resource variability.
Red Flags
- 15 material findings (CARs and NIRs) during validation/verification indicate significant gaps in the project's initial documentation and implementation, including unclear metering, missing stakeholder consultation records, and incomplete additionality evidence
- Contradiction between the validation report (project-specific baseline) and the monitoring report (jurisdictional baseline) creates ambiguity about which baseline was actually applied
- Leakage treatment is inconsistent: the PDD describes a quantified assessment while the monitoring report simply deems it negligible, with no quantified figure in either document
- Crediting period dates differ between the validation report (2008-11-01 to 2018-11-01) and the monitoring report (2009-04-07 to 2019-04-06), raising questions about the exact project start date
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 10,795 | 0 | 10,795 | |
| 2012 | 25,032 | 0 | 25,032 | |
| Total | 35,827 | 0 | 35,827 |
Risk Indicators
Investment test confirmed by DNV
Avoidance project, no reversal risk
Deemed negligible but inconsistent across docs
Jurisdictional but contradicted by validation report
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.