Canela Wind Farm Project
#539of 1935 in Renewable energy#6of 31 in Chile#360of 1459 in CDM (UNFCCC)#408of 1287 in ACM0002
Audit Analysis
The Canela Wind Farm is a straightforward renewable-energy displacement project with VVB-confirmed additionality and a reasonable 0% leakage deduction, but the record is weakened by missing verified emission-reduction figures, a contradiction in baseline methodology between the validation and monitoring reports, and the absence of documented FPIC or grievance mechanisms. The project carries low inherent permanence risk as a wind installation, yet the lack of a buffer pool and the project-specific baseline designation introduce moderate uncertainty.
Red Flags
- Baseline method is recorded as 'project-specific' in the monitoring report (2012) but 'jurisdictional' in the validation report (2008); the more recent monitoring report is privileged, but the discrepancy undermines confidence in the baseline definition.
- Neither the claimed nor the verified total emission reductions are present in the extracted record, making it impossible to confirm that delivered credits align with the ex-ante estimate.
- No Free, Prior and Informed Consent (FPIC) or grievance mechanism is documented in any available report, despite safeguards being mentioned in general terms.
- The grid emission factor of 0.5713 tCO₂/MWh is anchored to 2006 data; no updated or reassessed factor is found for the later years of the crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 44,919 | 0 | 44,919 | |
| Total | 44,919 | 0 | 44,919 |
Risk Indicators
VVB-confirmed combined test
Wind displacement, no reversal risk
0% deduction, justification wording inconsistent
Project-specific, method contradicts validation report
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.