Catalca Wind Power Project
GS-1650 ↗ · current registry ID: GS367
#18of 770 in Renewable energy#5of 121 in Turkey#6of 426 in Gold Standard (GS)#16of 383 in ACM0002
Audit Analysis
The Catalca Wind Power Project is a 60 MW grid-connected wind facility in Turkey verified under Gold Standard with a VVB-confirmed investment additionality test and a conservative 12% under-delivery against ex-ante estimates. The project carries moderate integrity risk due to the absence of a stated buffer pool, a project-specific baseline designation, and a long history of corrective action requests (though all were closed). CORSIA eligibility introduces a dual-channel consideration, and several transparency gaps (FNRB, usage monitoring) remain unaddressed in the extracted record.
Red Flags
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for a 7-year crediting period
- FPIC status is contradictory across documents (conducted per 2010 verification, not conducted per 2024 verification), and the more recent 2024 record indicates it was not performed
- CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel credit allocation risk
- Over 50 corrective and clarification requests were raised across multiple verification cycles, indicating recurring data-quality and reporting issues
- FNRB value and usage monitoring method are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 56,543 | 56,543 | 0 | |
| 2009 | 111,218 | 111,218 | 0 | |
| 2010 | 114,350 | 114,350 | 0 | |
| 2011 | 126,327 | 91,843 | 34,484 | |
| 2012 | 50,408 | 9,671 | 40,737 | |
| 2013 | 81,246 | 40,100 | 41,146 | |
| 2014 | 108,742 | 2,174 | 106,568 | |
| 2015 | 119,457 | 2,389 | 117,068 | |
| 2016 | 37,911 | 758 | 37,153 | |
| 2018 | 122,056 | 2,441 | 119,615 | |
| 2019 | 148,115 | 2,962 | 145,153 | |
| 2020 | 159,020 | 3,180 | 155,840 | |
| 2021 | 150,781 | 3,240 | 147,541 | |
| 2022 | 151,562 | 3,056 | 148,506 | |
| 2023 | 175,582 | 1,361 | 174,221 | |
| 2024 | 162,953 | 0 | 162,953 | |
| 2025 | 49,853 | 149 | 49,704 | |
| Total | 1,926,124 | 445,435 | 1,480,689 |
Risk Indicators
VVB-confirmed investment test
No buffer pool stated; no reversals reported
0% deemed negligible, reasonable for wind
Project-specific designation; grid EF stated
Grievance mechanism present; FPIC not conducted
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →