Energising Indian homes by Solar rooftop projects
#38of 387 in India#88of 629 in Verra (VCS)#6of 26 in AMS-I.F
Audit Analysis
A well-structured 84.75 MW solar PV rooftop project in India with VVB-confirmed additionality (investment and common-practice tests), a standardized CEA baseline emission factor, and no material findings. The project is delivering at or above its ex-ante annualized rate, and leakage of zero is reasonable for a renewable energy application. Key gaps include the complete absence of safeguards documentation (no FPIC, no grievance mechanism) and unknown CORSIA/CCP eligibility status.
Red Flags
- No safeguards documentation found: FPIC not conducted, no grievance mechanism in place, and safeguards not mentioned in any available document
- CORSIA eligibility and CCP approval status are not stated in any available document, leaving dual-channel risk unassessed
- Low extraction confidence in the document analysis, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 19 | 19 | 0 | |
| 2018 | 15,335 | 3,623 | 11,712 | |
| 2019 | 53,581 | 7,013 | 46,568 | |
| Total | 68,935 | 10,655 | 58,280 |
Risk Indicators
VVB-confirmed via investment and common-practice tests
Renewable energy project, no reversal risk identified
Zero leakage, reasonable for renewable energy
Standardized CEA database, not yet due for reassessment
No FPIC, no grievance mechanism, no safeguards documented
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →